Gallery:Echline Junction
5pm on a weekday and traffic heading out of Edinburgh is at a standstill. The roadworks are due to replacement of the tool booths and for some reason a low 30mph limit has been applied which is also in force on the opposite carriageway.
Originally uploaded to Coppermine on May 26, 2006 by TruveloNew toll plaza and carriageway widening works.
Originally uploaded to Coppermine on Oct 22, 2006 by GlenNew toll plaza - carriageway widening works can be seen in the foreground.
Originally uploaded to Coppermine on Sep 24, 2006 by GlenExplaination of matrix signals.
Originally uploaded to Coppermine on Sep 24, 2006 by GlenCarriageway widening on the A90 at Queensferry. View looking South from the roundabout.
Originally uploaded to Coppermine on Sep 24, 2006 by GlenThe new toll plaza replacing the booths which have been there for 30+ Years. Note the contraflow on the right hand side where a third lane is being added both ways in preparation for the new M9 spur. The new plaza is now in use after months of toll closures causing longer tailbacks.
Originally uploaded to Coppermine on Sep 22, 2006 by A8000_BobThe toll plaza photographed from coach (South Queensferry site)
Originally uploaded to Coppermine on Mar 20, 2006 by Flashheart