M8 Completion Approved

The study of British and Irish roads - their construction, numbering, history, mapping, past and future official roads proposals and general roads musings.

There is a separate forum for Street Furniture (traffic lights, street lights, road signs etc).

Registered users get access to other forums including discussions about other forms of transport, driving, fantasy roads and wishlists, and roads quizzes.

Moderator: Site Management Team

Post Reply
User avatar
wrinkly
Member
Posts: 8986
Joined: Tue Mar 04, 2008 12:17
Location: Leeds

Re: M8 Completion Approved

Post by wrinkly »

I wrote:
wrinkly wrote:What's all the white stuff in this image? It looks as though the A725 will be spanned by a series of very closely-spaced gantries within the roundabout.

It may be related to the fact that the A725 will be very low-lying here (it will require pumped drainage). Could the gantries be to weigh the road down and stop it floating on the water table? I'm aware of other locations where unusual measures are needed for that purpose.
I now think the "gantries" are more likely props to hold the retaining walls apart. Such props exist on the A34 under the M4 at Chieveley.
User avatar
a80
Member
Posts: 418
Joined: Sat Jul 23, 2005 22:15
Location: Cumbernauld

Re: M8 Completion Approved

Post by a80 »

Now a sign on the A8 e/b at Shawhead saying works start 26th June for 15 months.
Everyone dies, but not everyone lives...
User avatar
HandShandy
Member
Posts: 238
Joined: Wed Aug 17, 2011 16:51
Location: Paisley, Scotland
Contact:

Re: M8 Completion Approved

Post by HandShandy »

a80 wrote:... works start 26th June for 15 months.
June? Is that a typo or was it June 2014?

I know some preparatory works along the route have been started in the last couple weeks. They still haven't selected a primary contractor yet, so fingers crossed they can get on with it and move things forward.
Explore the history of the trunk roads and motorways of Glasgow and the West of Scotland at Glasgows-Motorways.co.uk
Follow us on twitter: @GlasgowsMways
Check out our Facebook page: Glasgow Motorway Archive
User avatar
a80
Member
Posts: 418
Joined: Sat Jul 23, 2005 22:15
Location: Cumbernauld

Re: M8 Completion Approved

Post by a80 »

Now I've noticed that, I'm not sure! I would reckon I meant to type July, but I'm sure I saw the sign for a while before.
Everyone dies, but not everyone lives...
User avatar
michael769
Member
Posts: 11413
Joined: Mon May 30, 2005 20:36
Location: Polbeth, West Lothian
Contact:

Re: M8 Completion Approved

Post by michael769 »

Scottish Roads Partnership to carry out £415m motorway upgrade
The preferred bidder has been announced for a £415m project to upgrade the motorway network in central Scotland.

The Scottish Roads Partnership (SRP) - a joint venture between Amey and Lagan - will start work later this year, with completion due in the spring of 2017.

The upgrade work will see the six-mile "missing link" completed on the M8 in North Lanarkshire.

Improvements to the Raith Interchange and widening of key sections of the M8, M73 and M74 are also part of the plan.

The work will see upgrading of the A8 between Baillieston and Newhouse to motorway standard.
SRP will now speak to sub-contractors to determine whether it will be able to deliver the project for the estimated cost of £415m.
Erm..... Shouldn't they have done that before bidding to do the work?
Minds are like parachutes - they only function when open
Thomas Robert Dewar(1864-1930)
Take the pledge
User avatar
wrinkly
Member
Posts: 8986
Joined: Tue Mar 04, 2008 12:17
Location: Leeds

Re: M8 Completion Approved

Post by wrinkly »

The Scottish Roads Partnership (SRP) - a joint venture between Amey and Lagan - will start work later this year, with completion due in the spring of 2017.
Must admit I've never heard of Lagan.

Could locals please clarify, have any visible advance works actually happened, on either the M8 completion, the Raith junction, or the M8/M73/M74 network improvements?
User avatar
a80
Member
Posts: 418
Joined: Sat Jul 23, 2005 22:15
Location: Cumbernauld

Re: M8 Completion Approved

Post by a80 »

I'm not aware of anything on the Raith Interchange but certainly preparatory works around Shawhead area
Everyone dies, but not everyone lives...
User avatar
stu20_ml2
Member
Posts: 183
Joined: Sat Jun 25, 2005 17:58
Location: Glasgow area
Contact:

Re: M8 Completion Approved

Post by stu20_ml2 »

Braehead Farm near Bargeddie and an electrical substation at Shawhead have already been demolished. That has cost £3 million. Up until recently the Scottish Government were demanding money from Westminster for £30million of advanced works so I'm not sure where they plucked that figure from!
Explore the history of the trunk roads and motorways of Glasgow and the West of Scotland at the Glasgow Motorway Archive
Follow us on twitter: @GlasgowsMways
Check out our Facebook page: Glasgow Motorway Archive
User avatar
novaecosse
Member
Posts: 4722
Joined: Tue Nov 21, 2006 23:35
Location: Dundee, Scotland

Re: M8 Completion Approved

Post by novaecosse »

stu20_ml2 wrote:Braehead Farm near Bargeddie and an electrical substation at Shawhead have already been demolished. That has cost £3 million. Up until recently the Scottish Government were demanding money from Westminster for £30million of advanced works so I'm not sure where they plucked that figure from!
Probably just needed £30m :lol:
User avatar
A303Chris
Elected Committee Member
Posts: 3587
Joined: Mon Sep 20, 2004 14:01
Location: Reading

Re: M8 Completion Approved

Post by A303Chris »

Update in the scotmans last week which says the last stumbling block has been overcome, which was an 82 widower who did not want to leave her home. However from the last few posts its seems her house has already gone.
The M25 - The road to nowhere
User avatar
wrinkly
Member
Posts: 8986
Joined: Tue Mar 04, 2008 12:17
Location: Leeds

Re: M8 Completion Approved

Post by wrinkly »

Exhibitions prior to start of main works

http://www.transportscotland.gov.uk/New ... ic-display
AndyB
SABRE Developer
Posts: 11057
Joined: Tue Dec 26, 2006 21:58
Location: Belfast N Ireland
Contact:

Re: M8 Completion Approved

Post by AndyB »

Lagan Construction is an NI firm. It's named after the family which owns it, rather than directly after the river.
m80
Member
Posts: 255
Joined: Sat Nov 20, 2010 12:38

Re: M8 Completion Approved

Post by m80 »

User avatar
A72
Member
Posts: 787
Joined: Fri Jul 20, 2012 17:21
Location: Newtown St Boswells, Scottish Borders

Re: M8 Completion Approved

Post by A72 »

Transport Scotland wrote:“In recent months, there has been advance work taking place along the Baillieston to Newhouse stretch of the A8 and near the Raith Junction on the M74. This work to stabilise areas of former mine workings adjacent to the A8/A725 at Shawhead was completed on programme in July.
City of Edinburgh Council, are you listening?!
The 7-Zone Challenge
A roads: 71/71
B roads: 181/181
Total: 252/252

Completed: 04/11/20.
User avatar
Gav
Member
Posts: 1968
Joined: Sat Oct 22, 2005 17:44

Re: M8 Completion Approved

Post by Gav »

Different in many ways - the A8 is adjacent to mine works, where as the A720 actually runs over. There is a myraid of mine workings around sherrifhall and the issue not actually with the mine stabilisation works but revolves around the diversional route that woudld be in place. They have a fear that during any works being carried out the land shifts and causes ground breakup under the diversional route thats carring traffic.

Some initial proposals involved a diversional route past dobbies to give them significant distance between the works and the live traffic.

The roundabout does need a lot of work to be carried out to resolve the issues that exist there.granted its not as bad as what it used to be like but it still needs to resolved and a proper through route established.
User avatar
wrinkly
Member
Posts: 8986
Joined: Tue Mar 04, 2008 12:17
Location: Leeds

Re: M8 Completion Approved

Post by wrinkly »

A72 wrote:City of Edinburgh Council, are you listening?!
You mean Scottish Government or Transport Scotland. The A720 was built as a non-trunk road but later trunked.
User avatar
michael769
Member
Posts: 11413
Joined: Mon May 30, 2005 20:36
Location: Polbeth, West Lothian
Contact:

Re: M8 Completion Approved

Post by michael769 »

Isn't the problem with Sheriffhall that there are also 2 geological fault lines there?
Minds are like parachutes - they only function when open
Thomas Robert Dewar(1864-1930)
Take the pledge
User avatar
exiled
President
Posts: 24640
Joined: Sat Jan 27, 2007 17:36
Location: South Lanarkshire

Re: M8 Completion Approved

Post by exiled »

wrinkly wrote: Could locals please clarify, have any visible advance works actually happened, on either the M8 completion, the Raith junction, or the M8/M73/M74 network improvements?
There are constructor/contractor signs up for a work area on the southbound off slip at the Raith.

My understanding is the route is going through a paddock to the north of the A725 by Bothwell, which this morning looked like a lake. How much drainage would normally be built in to a project like this?
Did you know there's more to SABRE than just the Forums?
Add your roads knowledge to the SABRE Wiki today!
Have you browsed SABRE Maps recently? Try getting involved!
User avatar
wrinkly
Member
Posts: 8986
Joined: Tue Mar 04, 2008 12:17
Location: Leeds

Re: M8 Completion Approved

Post by wrinkly »

It's very low-lying and will require pumped drainage.
User avatar
exiled
President
Posts: 24640
Joined: Sat Jan 27, 2007 17:36
Location: South Lanarkshire

Re: M8 Completion Approved

Post by exiled »

wrinkly wrote:It's very low-lying and will require pumped drainage.
Ta. The paddock often has standing water even after a dry run so that does not surprise me.

It also tends to have show jump equipment and a few horses, which makes sense given the expensive housing the other side. Including a house I would like to see go for the road on aesthetic grounds.

Anyone who drives the Raith/M74 at that point will probably recognise the house. I could not possibly comment.

Had another look tonight and there appears to be a work yard just off the Raith (M74 SB off slip) has been set up. By the looks of it for months.