Location: Leeds

Re: Sheriffhall Roundabout

Post by wrinkly »

The railway bridge looks basically all there!

http://www.midlothianadvertiser.co.uk/n ... -1-3243248

Edit: a clearer version of fthe same picture:

http://www.railforums.co.uk/attachment. ... 1388594111
User avatar
wrinkly
Member
Posts: 8986
Joined: Tue Mar 04, 2008 12:17
Location: Leeds

Re: Sheriffhall Roundabout

Post by wrinkly »

Slightly off topic but here's a view of newly-laid track on the Borders Railway with a view under the A720 in the background.

http://www.railbrit.co.uk/imageenlarge/ ... p?id=48779
mehere
Member
Posts: 1145
Joined: Tue Sep 20, 2005 08:12
Location: west yorkshire
Contact:

Re: Sheriffhall Roundabout

Post by mehere »

That's not track track laying commences next month when the track laying train arrives at Millerhill and heads south.
Bowshank tunnel has the only rail on slab on the whole line so the rails are already laid there.
Plus Pints have been laid.
Many sites have sleepers.
I reckon it will be finished ahead of the stated September opening.
I'd bet on even the year end for driver training.
The stations are well on the way. There's a couple of bridges to finish signals and track.
I'd bet on new year opening or March.
User avatar
Hagbard
Member
Posts: 1546
Joined: Tue Jan 10, 2006 22:34
Location: Galashiels

Re: Sheriffhall Roundabout

Post by Hagbard »

mehere wrote:That's not track track laying commences next month when the track laying train arrives at Millerhill and heads south.
Bowshank tunnel has the only rail on slab on the whole line so the rails are already laid there.
Plus Pints have been laid.
Many sites have sleepers.
I reckon it will be finished ahead of the stated September opening.
I'd bet on even the year end for driver training.
The stations are well on the way. There's a couple of bridges to finish signals and track.
I'd bet on new year opening or March.
There's still lots to do at Heriot and particularly in Gala. There is a vast amount of concrete going in here. The stone faced wall in the foreground has been completely removed and is being replaced by a reinforced concrete wall anchored to a slab which is being poured at a level well below the footings of the massive 1916 brick retaining wall behind. Work on the platform for Gala station can't even start until that is finished. Further south there is a pedestrian overbridge which has only just been started and a couple of others which require conversion or adaptations.
Given two good summers and a very mild winter it could have been built quicker, but the way it looks now I can't see the track, signalling and stations being finished before the spring at the earliest- handover for driver training etc is still scheduled for June.
User avatar
wrinkly
Member
Posts: 8986
Joined: Tue Mar 04, 2008 12:17
Location: Leeds

Re: Sheriffhall Roundabout

Post by wrinkly »

Just discovered there's stuff online - fairly detailed - about options for Sheriffhall roundabout!!

http://www.transportscotland.gov.uk/pro ... roundabout

How come our Scots members missed this?

The link "Executive Summary of the DMRB" is of course not to a summary of the DMRB. It's to a summary of the report.
User avatar
novaecosse
Member
Posts: 4722
Joined: Tue Nov 21, 2006 23:35
Location: Dundee, Scotland

Re: Sheriffhall Roundabout

Post by novaecosse »

wrinkly wrote:Just discovered there's stuff online - fairly detailed - about options for Sheriffhall roundabout!!

http://www.transportscotland.gov.uk/pro ... roundabout

How come our Scots members missed this?
Cause Transport Scotland sneak things online and don't tell anyone... :lol:
User avatar
parristim
Member
Posts: 471
Joined: Fri Mar 27, 2009 19:54
Location: Sheffield

Re: Sheriffhall Roundabout

Post by parristim »

Hallelulia!
Very Short Username
Member
Posts: 19
Joined: Fri Sep 14, 2012 10:04

Re: Sheriffhall Roundabout

Post by Very Short Username »

All of those options include a junction for the Millerhill Road section of the A6106, but on the Borders Railway site the engineering plans clearly show that road being stopped up at Sherifhall and being downgraded to an agricultural/access single track road with access only from The Cockatoo end.

http://www.bordersrailway.co.uk/media/1 ... 000004.pdf

They also went trough all the effort/cost of extending the Shawfair road to effectively bypass the Millerhill Road, and the way the new road is laid out to the north/Millerhill opposite from The Cockatoo hints that this road is destined to continue to the A68 junction of the A720, similar to option 4 but moving the East Collector Distributor Road to the north.



Although, some of the new signage erected heading north on the new Shawfair road says Dalkeith and A720 is accessible by turning right at the new roundabout towards the Cockatoo, even though no rail crossing has been built?

Anyways, is option 8 looking the most likely?
User avatar
wrinkly
Member
Posts: 8986
Joined: Tue Mar 04, 2008 12:17
Location: Leeds

Re: Sheriffhall Roundabout

Post by wrinkly »

Scottish Parliament today:
Colin Beattie (Midlothian North and Musselburgh) (Scottish National Party): To ask the Scottish Government what progress it is making on achieving grade separation for the Sheriffhall roundabout.
(S4W-23749)

Derek Mackay: The Design Manual for Roads and Bridges sets outs a three stage design process for road schemes. The Stage 1 Assessment is now complete which narrowed an initial list of eight junction improvement options down to four. These are now being assessed as part of the Stage 2 Assessment to identify a preferred option. This is programmed to be complete by autumn 2015 at which time the preferred option would be made public.
Very Short Username
Member
Posts: 19
Joined: Fri Sep 14, 2012 10:04

Re: Sheriffhall Roundabout

Post by Very Short Username »

Well they reopened the northern part of the A6106 a few days ago, and the impact on the A720 is already noticeable now the extra signal phase is back to allow traffic onto the rounabout. Queues eastbound to the roundabout have definitely got longer.
User avatar
wrinkly
Member
Posts: 8986
Joined: Tue Mar 04, 2008 12:17
Location: Leeds

Re: Sheriffhall Roundabout

Post by wrinkly »

Colin Beattie (Midlothian North and Musselburgh) (Scottish National Party): To ask the Scottish Government, further to the answer to question S4W -23749 by Derek Mackay on 9 January 2015, whether it will provide an update on what progress it is making on achieving grade separation for the Sheriffhall roundabout.
(S4W-28403)

Derek Mackay: The Design Manual for Roads and Bridges sets outs a three stage design process for road schemes. With the stage 1 assessment complete we are progressing the stage 2 assessment to identify a preferred option. It is expected that the stage 2 assessment will be completed during summer 2016 at which time a preferred option will be made public for comment.
User avatar
wrinkly
Member
Posts: 8986
Joined: Tue Mar 04, 2008 12:17
Location: Leeds

Re: Sheriffhall Roundabout

Post by wrinkly »

User avatar
jackal
Member
Posts: 7547
Joined: Tue Jan 08, 2008 23:33
Location: M6

Re: Sheriffhall Roundabout

Post by jackal »

wrinkly wrote:Exhibitions next week:

http://www.transport.gov.scot/news/impr ... ll-display
I look forward to seeing the options, though if I remember correctly the more ambitious parallel carriageway designs have fallen by the wayside.

Speaking of a lack of ambition, could Transport Scotland really not come up with a better logo than a level crossing?!
User avatar
Gav
Member
Posts: 1968
Joined: Sat Oct 22, 2005 17:44

Re: Sheriffhall Roundabout

Post by Gav »

some of the proposals
Attachments
SH5.jpg
SH6.jpg
SH7.jpg
User avatar
Gav
Member
Posts: 1968
Joined: Sat Oct 22, 2005 17:44

Re: Sheriffhall Roundabout

Post by Gav »

and a few more
Attachments
SH4.jpg
SH5.jpg
SH8.jpg
djw1981
Member
Posts: 1803
Joined: Mon May 05, 2008 00:07
Location: Falkirk

Re: Sheriffhall Roundabout

Post by djw1981 »

jackal wrote:
Speaking of a lack of ambition, could Transport Scotland really not come up with a better logo than a level crossing?!
intersection between the main 2 modalities?
User avatar
wrinkly
Member
Posts: 8986
Joined: Tue Mar 04, 2008 12:17
Location: Leeds

Re: Sheriffhall Roundabout

Post by wrinkly »

If I remember correctly some of the layouts posted by Gav were dropped a while ago.
User avatar
novaecosse
Member
Posts: 4722
Joined: Tue Nov 21, 2006 23:35
Location: Dundee, Scotland

Re: Sheriffhall Roundabout

Post by novaecosse »

djw1981 wrote:
jackal wrote:
Speaking of a lack of ambition, could Transport Scotland really not come up with a better logo than a level crossing?!
intersection between the main 2 modalities?
and in the shape of the Saltire!
User avatar
Bryn666
Elected Committee Member
Posts: 35754
Joined: Thu Jun 20, 2002 20:54
Contact:

Re: Sheriffhall Roundabout

Post by Bryn666 »

It's better than the zig-zag of confusion used down here...
Bryn
Terminally cynical, unimpressed, and nearly Middle Age already.
She said life was like a motorway; dull, grey, and long.

Blog - https://showmeasign.online/
X - https://twitter.com/ShowMeASignBryn
YouTube - https://www.youtube.com/@BrynBuck
User avatar
jackal
Member
Posts: 7547
Joined: Tue Jan 08, 2008 23:33
Location: M6

Re: Sheriffhall Roundabout

Post by jackal »

wrinkly wrote:If I remember correctly some of the layouts posted by Gav were dropped a while ago.
That's also my recollection.
djw1981 wrote:
jackal wrote:
Speaking of a lack of ambition, could Transport Scotland really not come up with a better logo than a level crossing?!
intersection between the main 2 modalities?
The problem is it's not an intersection, it's just one getting in the way of the other due to a lack of adequate investment...