A19/A1058 junction improvement

The study of British and Irish roads - their construction, numbering, history, mapping, past and future official roads proposals and general roads musings.

There is a separate forum for Street Furniture (traffic lights, street lights, road signs etc).

Registered users get access to other forums including discussions about other forms of transport, driving, fantasy roads and wishlists, and roads quizzes.

Moderator: Site Management Team

Post Reply
User avatar
Chris5156
Deputy Treasurer
Posts: 16908
Joined: Thu Sep 06, 2001 21:50
Location: Hampshire
Contact:

Re: A19/A1058 junction improvement

Post by Chris5156 »

crowntown100 wrote:
wrinkly wrote:The half-bridge is wide enough to carry four narrow lanes, even though the finished bridge will only be D2. (The bridges in the original Coast Road dualling, such as the bridges over the A19 roundabout, were designed for D3.)
Aren't the new bridges going to be D3, but narrowed to D2 with hatching like the original bridges?
There’s no intention to restore the Coast Road to D3, and even if that did happen, the volume of traffic turning off at the A19 is such that you’d inevitably need a lane drop there with just two lanes through the junction. So if the bridge is only going to carry two lanes why spend money to make it any wider?

What I don’t understand is why the councils up there don’t save themselves some money on paint and just mark the A1058 with a hard shoulder instead of having miles and miles of stripes.
User avatar
crowntown100
Member
Posts: 738
Joined: Sun Jan 06, 2013 21:13
Location: Helston, Cornwall

Re: A19/A1058 junction improvement

Post by crowntown100 »

Chris5156 wrote:
crowntown100 wrote:
wrinkly wrote:The half-bridge is wide enough to carry four narrow lanes, even though the finished bridge will only be D2. (The bridges in the original Coast Road dualling, such as the bridges over the A19 roundabout, were designed for D3.)
Aren't the new bridges going to be D3, but narrowed to D2 with hatching like the original bridges?
There’s no intention to restore the Coast Road to D3, and even if that did happen, the volume of traffic turning off at the A19 is such that you’d inevitably need a lane drop there with just two lanes through the junction. So if the bridge is only going to carry two lanes why spend money to make it any wider?

What I don’t understand is why the councils up there don’t save themselves some money on paint and just mark the A1058 with a hard shoulder instead of having miles and miles of stripes.
I know that there isn't any intention of widening it ever, but I'm sure that the video they did of the scheme showed the bridges having the ability of carrying 3 whole lanes, even if that was never used and hatched down to two, like the rest of the Coast Road, which would suggest how they can get 4 narrow lanes over the bridge.

However, I haven't seen any drawings of the scheme, so I'm happy to be proven wrong! :)
Harry
User avatar
Bryn666
Elected Committee Member
Posts: 35755
Joined: Thu Jun 20, 2002 20:54
Contact:

Re: A19/A1058 junction improvement

Post by Bryn666 »

Chris5156 wrote:
crowntown100 wrote:
wrinkly wrote:The half-bridge is wide enough to carry four narrow lanes, even though the finished bridge will only be D2. (The bridges in the original Coast Road dualling, such as the bridges over the A19 roundabout, were designed for D3.)
Aren't the new bridges going to be D3, but narrowed to D2 with hatching like the original bridges?
There’s no intention to restore the Coast Road to D3, and even if that did happen, the volume of traffic turning off at the A19 is such that you’d inevitably need a lane drop there with just two lanes through the junction. So if the bridge is only going to carry two lanes why spend money to make it any wider?

What I don’t understand is why the councils up there don’t save themselves some money on paint and just mark the A1058 with a hard shoulder instead of having miles and miles of stripes.
Probably because "it'd be different and confusing" like any other excuse for not doing logical things.
Bryn
Terminally cynical, unimpressed, and nearly Middle Age already.
She said life was like a motorway; dull, grey, and long.

Blog - https://showmeasign.online/
X - https://twitter.com/ShowMeASignBryn
YouTube - https://www.youtube.com/@BrynBuck
User avatar
Chris5156
Deputy Treasurer
Posts: 16908
Joined: Thu Sep 06, 2001 21:50
Location: Hampshire
Contact:

Re: A19/A1058 junction improvement

Post by Chris5156 »

Bryn666 wrote:
What I don’t understand is why the councils up there don’t save themselves some money on paint and just mark the A1058 with a hard shoulder instead of having miles and miles of stripes.
Probably because "it'd be different and confusing" like any other excuse for not doing logical things.
I expect the hatching made sense when the third lane was initially removed, because it made it very obvious that the space was not to be driven in. But nobody expects to drive in it now, so it would make sense to normalise the layout. I doubt it will happen, though, because like for like renewal every time is easier than thinking about things :roll:
User avatar
wrinkly
Member
Posts: 8986
Joined: Tue Mar 04, 2008 12:17
Location: Leeds

Re: A19/A1058 junction improvement

Post by wrinkly »

I was there on Sunday and have been meaning to post that traffic on the roundabout now goes over the new south bridge over the future A19. (It was already going over the north one.)

This press release appeared a month ago:

https://www.gov.uk/government/news/trip ... inal-stage

They're still fond of the phrase "triple-decker junction" and now claiming it's the first in the NE. Seem to be forgetting the A167(M).
djw1981
Member
Posts: 1803
Joined: Mon May 05, 2008 00:07
Location: Falkirk

Re: A19/A1058 junction improvement

Post by djw1981 »

I was also there recently, and the progress at digging out the new A19 underpass seems slow, given that traffic was on the 'new' sliproad to the roundabout not long into 2018, and piling was in Feb/March.
User avatar
owen b
Member
Posts: 9860
Joined: Sun Mar 16, 2003 15:22
Location: Luton

Re: A19/A1058 junction improvement

Post by owen b »

wrinkly wrote: Wed Jun 06, 2018 15:18
They're still fond of the phrase "triple-decker junction" and now claiming it's the first in the NE. Seem to be forgetting the A167(M).
Presumably they are referring to what we generally call stacked roundabouts and forget that there are other types of three level junctions. Growing up in Durham, stacked roundabouts were quite exotic to me, as we didn't have any in the north east. The nearest were Ferrybridge (M62/A1), M1/M62 and A1(M)/M18.
Owen
User avatar
wrinkly
Member
Posts: 8986
Joined: Tue Mar 04, 2008 12:17
Location: Leeds

Re: A19/A1058 junction improvement

Post by wrinkly »

Or they're forgetting non-HE roads.
User avatar
Chris5156
Deputy Treasurer
Posts: 16908
Joined: Thu Sep 06, 2001 21:50
Location: Hampshire
Contact:

Re: A19/A1058 junction improvement

Post by Chris5156 »

wrinkly wrote: Thu Jun 07, 2018 00:00 Or they're forgetting non-HE roads.
I expect so. In press releases HE (and HA before them) tend to assume their roads are the only roads.
User avatar
wrinkly
Member
Posts: 8986
Joined: Tue Mar 04, 2008 12:17
Location: Leeds

Re: A19/A1058 junction improvement

Post by wrinkly »

The reconstruction of Norham Road bridge over the A1058 is finished and the diamond junction is fully operational again.
Glenn A
Member
Posts: 9776
Joined: Fri Apr 15, 2005 19:31
Location: Cumbria

Re: A19/A1058 junction improvement

Post by Glenn A »

wrinkly wrote: Sat Sep 01, 2018 23:53 The reconstruction of Norham Road bridge over the A1058 is finished and the diamond junction is fully operational again.
Thank goodness, i was on the A1058 this summer and it was horrendous around the Norham Rd Bridge, with a contraflow and 30 mph speed limit.
On a different note, I do find the signalised junction at Billy Mill far better than the roundabout, where delays and near misses were common.
User avatar
Beardy5632
Member
Posts: 1436
Joined: Tue Oct 13, 2009 16:45
Location: Forest of Dean

Re: A19/A1058 junction improvement

Post by Beardy5632 »



A video of the work on the Geordie Drone channel.
British & Irish cities driven in - 48/75
England - 36/52, Scotland - 7/7, Wales - 5/6, NI - 0/5, RoI - 0/5
User avatar
Euan
Member
Posts: 1851
Joined: Mon Jan 01, 2018 07:59
Location: North Ayrshire

Re: A19/A1058 junction improvement

Post by Euan »

The tunnel appears to be making good progress. The level of congestion at the junction after the tunnel opens will depend on how much traffic passes straight through the junction either on the A19 or on the A1058 without needing to use the roundabout to get from one road to the other. Presumably most of the traffic which currently uses the roundabout will be A19 through traffic in which case the tunnel will make a big difference.
E-roads, M-roads, A-roads, N-roads, B-roads, R-roads, C-roads, L-roads, U-roads, footpaths
User avatar
Beardy5632
Member
Posts: 1436
Joined: Tue Oct 13, 2009 16:45
Location: Forest of Dean

Re: A19/A1058 junction improvement

Post by Beardy5632 »

I think that is the case. It certainly is when I've been up that way to visit the family.
It'll be interesting to see what impact it'll have on Moor Farm though.
British & Irish cities driven in - 48/75
England - 36/52, Scotland - 7/7, Wales - 5/6, NI - 0/5, RoI - 0/5
User avatar
Beardy5632
Member
Posts: 1436
Joined: Tue Oct 13, 2009 16:45
Location: Forest of Dean

Re: A19/A1058 junction improvement

Post by Beardy5632 »

It's not far off now!


The new underpass was partially open the other day but it looks like they've shut it again on the YouTube footage, presumably just to do the finishing touches on it.
British & Irish cities driven in - 48/75
England - 36/52, Scotland - 7/7, Wales - 5/6, NI - 0/5, RoI - 0/5
User avatar
jackal
Member
Posts: 7549
Joined: Tue Jan 08, 2008 23:33
Location: M6

Re: A19/A1058 junction improvement

Post by jackal »

Euan wrote: Sat Jan 05, 2019 21:33 The tunnel appears to be making good progress. The level of congestion at the junction after the tunnel opens will depend on how much traffic passes straight through the junction either on the A19 or on the A1058 without needing to use the roundabout to get from one road to the other. Presumably most of the traffic which currently uses the roundabout will be A19 through traffic in which case the tunnel will make a big difference.
The movements along the A19 are indeed dominant:

Image

(IIRC the numbers are just for the rbt, not the flyover, hence the very low A1058-A1058 numbers.)

https://infrastructure.planninginspecto ... ue%201.pdf
Glenn A
Member
Posts: 9776
Joined: Fri Apr 15, 2005 19:31
Location: Cumbria

Re: A19/A1058 junction improvement

Post by Glenn A »

Beardy5632 wrote: Sun Mar 31, 2019 07:40 It's not far off now!


The new underpass was partially open the other day but it looks like they've shut it again on the YouTube footage, presumably just to do the finishing touches on it.
At last and a fine looking junction, also this will reduce delays for traffic travelling from the Tyne Tunnel to Northumberland by avoiding the roundabout.
Out of interest, I am old enough to remember when this had the unofficial name of the Europa Lodge roundabout, due to the motel nearby.
User avatar
Beardy5632
Member
Posts: 1436
Joined: Tue Oct 13, 2009 16:45
Location: Forest of Dean

Re: A19/A1058 junction improvement

Post by Beardy5632 »

It's going to be a much better route heading that way once it's all open. Very different from this time 10 years ago when the new tunnel let alone the Silverlink was still being constructed.

I wonder if they'll start looking at Moor Farm and Seaton Burn again once this is complete.
British & Irish cities driven in - 48/75
England - 36/52, Scotland - 7/7, Wales - 5/6, NI - 0/5, RoI - 0/5
Paul7755
Member
Posts: 190
Joined: Mon Jul 11, 2016 11:59
Location: Hampshire

Re: A19/A1058 junction improvement

Post by Paul7755 »

Open today, Evening Chronic article has a video. Still ranting on about it being a triple decker roundabout... :(

https://www.chroniclelive.co.uk/news/no ... d-16058021
Paul7755
Member
Posts: 190
Joined: Mon Jul 11, 2016 11:59
Location: Hampshire

Re: A19/A1058 junction improvement

Post by Paul7755 »

Up to date drone footage:
https://youtu.be/4xtT-wPCdOI