Duncan macknight
Committee Member
Posts: 338
Joined: Thu Jul 23, 2015 10:59
Location: Inverness

Re: A9 dualling

Post by Duncan macknight »

northernlight wrote: Mon Jul 12, 2021 15:42

Thanks Duncan very much for this useful and interesting information.

I think that the A835 from Tore to Maryburgh was classified as the A834 for about four and a half years from 1981 to 1985, when the Tore-Ullapool road passed through Dingwall. The minor road from the A832 at Moy Bridge to Maryburgh (before the new road opened in 1985) is shown on some maps as a non-primary section of the A835 from as early as 1977/1978, which seems odd, but perhaps this road was used to access Tore before 1985, in order to avoid Strathpeffer and Dingwall? In my recollection is was a fairly narrow road.

It is also slightly odd that the design standard of the A9 from Tore to the Cromarty Bridge and the A834 (later A835) to Maryburgh was slightly lower than the A9 to the south of Inverness. Although built to a high standard, the carriageway is noticeably less wide.
Yes, the A835 didn't come into play until I presume the whole system was complete. I'm not too sure of the full sequence of events so I just stick to A835. Its what everyone knows anyway!

The carriageway width does narrow down across Black Isle, Specifically its just underneath the Golden Bridge at Raigmore where the hard strip disappears. I do not know why but I am on the case!
Stravaiger
Member
Posts: 19
Joined: Mon Aug 07, 2017 13:27

Re: A9 dualling

Post by Stravaiger »

Any word on luncarty/ Birnam opening date yet? I feel they're dragging their heels a bit now......
Duncan macknight
Committee Member
Posts: 338
Joined: Thu Jul 23, 2015 10:59
Location: Inverness

Re: A9 dualling

Post by Duncan macknight »

Stravaiger wrote: Fri Jul 16, 2021 14:04 Any word on luncarty/ Birnam opening date yet? I feel they're dragging their heels a bit now......
Much of the new surface is down aside from the bankfoot junction so it can't be too long now. Another Month or 2 maximum
A9NWIL
Member
Posts: 3319
Joined: Fri Jul 01, 2016 02:36

Re: A9 dualling

Post by A9NWIL »

Duncan macknight wrote: Fri Jul 16, 2021 16:45
Stravaiger wrote: Fri Jul 16, 2021 14:04 Any word on luncarty/ Birnam opening date yet? I feel they're dragging their heels a bit now......
Much of the new surface is down aside from the bankfoot junction so it can't be too long now. Another Month or 2 maximum
Any chance its done by Aug 10th? as thats when Im travelling to Thurso and I will be using the A9.
Formerly known as 'lortjw'
Stravaiger
Member
Posts: 19
Joined: Mon Aug 07, 2017 13:27

Re: A9 dualling

Post by Stravaiger »

Doubt it- miles of centre line crash barrier not yet done, for starters....
Stravaiger
Member
Posts: 19
Joined: Mon Aug 07, 2017 13:27

Re: A9 dualling

Post by Stravaiger »

Doubt it- miles of centre line crash barrier not yet done, for starters....
User avatar
owen b
Member
Posts: 9851
Joined: Sun Mar 16, 2003 15:22
Location: Luton

Re: A9 dualling

Post by owen b »

lotrjw wrote: Sat Jul 17, 2021 12:51
Duncan macknight wrote: Fri Jul 16, 2021 16:45
Stravaiger wrote: Fri Jul 16, 2021 14:04 Any word on luncarty/ Birnam opening date yet? I feel they're dragging their heels a bit now......
Much of the new surface is down aside from the bankfoot junction so it can't be too long now. Another Month or 2 maximum
Any chance its done by Aug 10th? as thats when Im travelling to Thurso and I will be using the A9.
I came that way this morning and there's signs stating that delays are possible until December. There's a 40 limit all the way through the works.
Owen
A9NWIL
Member
Posts: 3319
Joined: Fri Jul 01, 2016 02:36

Re: A9 dualling

Post by A9NWIL »

owen b wrote: Sun Jul 18, 2021 21:32
lotrjw wrote: Sat Jul 17, 2021 12:51
Duncan macknight wrote: Fri Jul 16, 2021 16:45

Much of the new surface is down aside from the bankfoot junction so it can't be too long now. Another Month or 2 maximum
Any chance its done by Aug 10th? as thats when Im travelling to Thurso and I will be using the A9.
I came that way this morning and there's signs stating that delays are possible until December. There's a 40 limit all the way through the works.
Thanks. Thats quite slow, I suppose they thought the usual 50mph was too fast for though the works?
Formerly known as 'lortjw'
User avatar
orudge
Site Manager
Posts: 8226
Joined: Sun May 27, 2007 12:23
Location: Banchory
Contact:

Re: A9 dualling

Post by orudge »

lotrjw wrote: Mon Jul 19, 2021 20:19 Thanks. Thats quite slow, I suppose they thought the usual 50mph was too fast for though the works?
40mph tends to be more common in Scotland, especially on S2s.
B9099
Member
Posts: 13
Joined: Sat Aug 18, 2018 07:55

Re: A9 dualling

Post by B9099 »

Northbound traffic is now on the northbound carriageway and southbound traffic on the southbound carriageway. Still single file as works are on going but it's another step closer. Bankfoot south junction is fully operational too.
A9NWIL
Member
Posts: 3319
Joined: Fri Jul 01, 2016 02:36

Re: A9 dualling

Post by A9NWIL »

orudge wrote: Tue Jul 20, 2021 14:25
lotrjw wrote: Mon Jul 19, 2021 20:19 Thanks. Thats quite slow, I suppose they thought the usual 50mph was too fast for though the works?
40mph tends to be more common in Scotland, especially on S2s.
Ah OK that will be why the M74 had a 40mph with one lane closed when I was on it before.
Formerly known as 'lortjw'
A9NWIL
Member
Posts: 3319
Joined: Fri Jul 01, 2016 02:36

Re: A9 dualling

Post by A9NWIL »

B9099 wrote: Tue Jul 20, 2021 18:30 Northbound traffic is now on the northbound carriageway and southbound traffic on the southbound carriageway. Still single file as works are on going but it's another step closer. Bankfoot south junction is fully operational too.
That sounds like a big improvement from the pictures that got posted on here a while back.
Formerly known as 'lortjw'
User avatar
Burns
Member
Posts: 3791
Joined: Mon Oct 16, 2006 21:37
Location: Dundee
Contact:

Re: A9 dualling

Post by Burns »

B9099 wrote: Tue Jul 20, 2021 18:30 Northbound traffic is now on the northbound carriageway and southbound traffic on the southbound carriageway. Still single file as works are on going but it's another step closer. Bankfoot south junction is fully operational too.
That must be a very recent change. Now all we need are four months painstaking snagging works and it'll be ready for opening in December.
IanRB
Member
Posts: 85
Joined: Tue Jan 06, 2015 14:44

Re: A9 dualling

Post by IanRB »

Burns wrote: Wed Jul 21, 2021 10:04
B9099 wrote: Tue Jul 20, 2021 18:30 Northbound traffic is now on the northbound carriageway and southbound traffic on the southbound carriageway. Still single file as works are on going but it's another step closer. Bankfoot south junction is fully operational too.
That must be a very recent change. Now all we need are four months painstaking snagging works and it'll be ready for opening in December.
It wasn't like that on Monday morning, so I suspect it was done overnight Monday/Tuesday.
User avatar
Burns
Member
Posts: 3791
Joined: Mon Oct 16, 2006 21:37
Location: Dundee
Contact:

Re: A9 dualling

Post by Burns »

I wonder if they still have those "Warning Overhead Structure" signs up right by the new bridges? Yeah, you don't say. I saw the bridges coming a mile off but I didn't see the sign till I got there.
B9099
Member
Posts: 13
Joined: Sat Aug 18, 2018 07:55

Re: A9 dualling

Post by B9099 »

IanRB wrote: Wed Jul 21, 2021 10:41
Burns wrote: Wed Jul 21, 2021 10:04
B9099 wrote: Tue Jul 20, 2021 18:30 Northbound traffic is now on the northbound carriageway and southbound traffic on the southbound carriageway. Still single file as works are on going but it's another step closer. Bankfoot south junction is fully operational too.
That must be a very recent change. Now all we need are four months painstaking snagging works and it'll be ready for opening in December.
It wasn't like that on Monday morning, so I suspect it was done overnight Monday/Tuesday.
Yes, that is correct.
I travel to and from work along this section of the A9 and it was quite frustrating seeing next to nothing happening for a few months last year.
It is a slow process but has been quite interesting seeing it progressing day by day.
B9099
Member
Posts: 13
Joined: Sat Aug 18, 2018 07:55

Re: A9 dualling

Post by B9099 »

Burns wrote: Wed Jul 21, 2021 14:45 I wonder if they still have those "Warning Overhead Structure" signs up right by the new bridges? Yeah, you don't say. I saw the bridges coming a mile off but I didn't see the sign till I got there.
I can't say I have noticed the signs. I will look tomorrow. I have noticed the structures though!
IanRB
Member
Posts: 85
Joined: Tue Jan 06, 2015 14:44

Re: A9 dualling

Post by IanRB »

Burns wrote: Wed Jul 21, 2021 14:45 I wonder if they still have those "Warning Overhead Structure" signs up right by the new bridges? Yeah, you don't say. I saw the bridges coming a mile off but I didn't see the sign till I got there.
I think those signs are intended for construction traffic.
User avatar
Burns
Member
Posts: 3791
Joined: Mon Oct 16, 2006 21:37
Location: Dundee
Contact:

Re: A9 dualling

Post by Burns »

IanRB wrote: Wed Jul 21, 2021 19:55
Burns wrote: Wed Jul 21, 2021 14:45 I wonder if they still have those "Warning Overhead Structure" signs up right by the new bridges? Yeah, you don't say. I saw the bridges coming a mile off but I didn't see the sign till I got there.
I think those signs are intended for construction traffic.
I know but they're still funny.
User avatar
orudge
Site Manager
Posts: 8226
Joined: Sun May 27, 2007 12:23
Location: Banchory
Contact:

Re: A9 dualling

Post by orudge »

Daily Record story mentioning that the Transport Secretary met locals in Dunkeld and Birnam last week. Not really any useful information in it but the fact that things are still happening is at least something.