M56 new Junction 11a

The study of British and Irish roads - their construction, numbering, history, mapping, past and future official roads proposals and general roads musings.

There is a separate forum for Street Furniture (traffic lights, street lights, road signs etc).

Registered users get access to other forums including discussions about other forms of transport, driving, fantasy roads and wishlists, and roads quizzes.

Moderator: Site Management Team

User avatar
jackal
Member
Posts: 7549
Joined: Tue Jan 08, 2008 23:33
Location: M6

M56 new Junction 11a

Post by jackal »

There's an information event about this on 6 Sep, prior to consultation 'later in the year'. Should be freeflow but wouldn't put money on it.

http://www.highways.gov.uk/roads/road-p ... ction-11a/
User avatar
Truvelo
Member
Posts: 17467
Joined: Wed May 29, 2002 21:10
Location: Staffordshire
Contact:

Re: M56 new Junction 11a

Post by Truvelo »

I'm surprised there were never any proposals for a decent link between the M56 and the Runcorn Expressways when they were first built.
How would you like your grade separations, Sir?
Big and complex.
User avatar
Bryn666
Elected Committee Member
Posts: 35755
Joined: Thu Jun 20, 2002 20:54
Contact:

Re: M56 new Junction 11a

Post by Bryn666 »

J11A presumably is intended to link the M56, Central Expressway, and the Mersey Gateway Bridge.

Sounds like a good idea to me. Ideally a simple fork off the M56 would be best, with connection to the unfinished roundabout GSJ at the end of the current expressway.
Bryn
Terminally cynical, unimpressed, and nearly Middle Age already.
She said life was like a motorway; dull, grey, and long.

Blog - https://showmeasign.online/
X - https://twitter.com/ShowMeASignBryn
YouTube - https://www.youtube.com/@BrynBuck
User avatar
jackal
Member
Posts: 7549
Joined: Tue Jan 08, 2008 23:33
Location: M6

Re: M56 new Junction 11a

Post by jackal »

Bryn666 wrote:J11A presumably is intended to link the M56, Central Expressway, and the Mersey Gateway Bridge.

Sounds like a good idea to me. Ideally a simple fork off the M56 would be best, with connection to the unfinished roundabout GSJ at the end of the current expressway.
This can certainly be done for the onslip but there's development in the way of where the offslip would've diverged. It would be possible to squeeze a freeflow offslip in further south but I expect they'll just bodge it into a half dumbbell or something.

A curiosity of the Gateway project is that the Central Expressway mainline, which previously ran down the Southern Expressway to the J11a site, is being diverted down the Weston Link as shown here, a change that doesn't really make sense with J11a presumably intended to become the main access from the M56 East.
User avatar
PeterA5145
Member
Posts: 25347
Joined: Sun Mar 24, 2002 00:19
Location: Stockport, Cheshire
Contact:

Re: M56 new Junction 11a

Post by PeterA5145 »

jackal wrote:A curiosity of the Gateway project is that the Central Expressway mainline, which previously ran down the Southern Expressway to the J11a site, is being diverted down the Weston Link as shown here, a change that doesn't really make sense with J11a presumably intended to become the main access from the M56 East.
I'm pretty sure that traffic counts will show a lot more traffic approaching the bridge on the M56 from the west rather than from the east. Traffic from the east heading for central Liverpool or even north Widnes has the alternative of going over Thelwall and using the M62.
“The human race divides politically into those who want people to be controlled and those who have no such desire.” – Robert A. Heinlein
User avatar
jackal
Member
Posts: 7549
Joined: Tue Jan 08, 2008 23:33
Location: M6

Re: M56 new Junction 11a

Post by jackal »

PeterA5145 wrote:
jackal wrote:A curiosity of the Gateway project is that the Central Expressway mainline, which previously ran down the Southern Expressway to the J11a site, is being diverted down the Weston Link as shown here, a change that doesn't really make sense with J11a presumably intended to become the main access from the M56 East.
I'm pretty sure that traffic counts will show a lot more traffic approaching the bridge on the M56 from the west rather than from the east. Traffic from the east heading for central Liverpool or even north Widnes has the alternative of going over Thelwall and using the M62.
Perhaps, but the Central Expressway will not only be used for bridge traffic. I expect the majority of M56<->Runcorn traffic on it will be to/from the M56E, given M56W traffic would largely use the Weston Point Expressway instead.

I believe the real reason the mainline at the Central/Southern/Weston Link GSJ is being changed is that the traffic modelling assumed pre-J11a flows. Funding for J11a was only announced in late 2014, i.e. after construction on the Gateway project started.
User avatar
Bryn666
Elected Committee Member
Posts: 35755
Joined: Thu Jun 20, 2002 20:54
Contact:

Re: M56 new Junction 11a

Post by Bryn666 »

To be fair the new interchange between the Weston Link and Central Expressway is not going to be underpowered either way you look at it. It's far superior to the trumpet it replaces and also introdices CD lanes.
Bryn
Terminally cynical, unimpressed, and nearly Middle Age already.
She said life was like a motorway; dull, grey, and long.

Blog - https://showmeasign.online/
X - https://twitter.com/ShowMeASignBryn
YouTube - https://www.youtube.com/@BrynBuck
User avatar
Hugo Nebula
Member
Posts: 536
Joined: Sat Apr 10, 2004 19:04
Location: Zone 5

Re: M56 new Junction 11a

Post by Hugo Nebula »

Truvelo wrote:I'm surprised there were never any proposals for a decent link between the M56 and the Runcorn Expressways when they were first built.
There were plans for a link, not necessarily direct.

The original expressways were meant to continue eastwards from the existing Murdishaw roundabout and continue up towards what is now Daresbury Expressway at the junction for Windmill Hill to close the loop. Meanwhile there would have been a link road from the M56 Junction 10 at what is now the Daresbury Business Park entrance to a GS roundabout on the expressway.
JF2309
Member
Posts: 242
Joined: Thu Feb 19, 2015 12:43

Re: M56 new Junction 11a

Post by JF2309 »

Now would be the ideal time to renumber the junctions so that J13 is no longer missing.
User avatar
Truvelo
Member
Posts: 17467
Joined: Wed May 29, 2002 21:10
Location: Staffordshire
Contact:

Re: M56 new Junction 11a

Post by Truvelo »

Hugo Nebula wrote:Meanwhile there would have been a link road from the M56 Junction 10 at what is now the Daresbury Business Park entrance to a GS roundabout on the expressway.
I can go one better, a trumpet instead. There are different layouts for the junction with the expressway. Some plans had it as an at-grade roundabout as traffic on the eastern side of the expressway was predicted to be lower.

The problem with new towns in general is the expressways were designed to move traffic within the town but not to connect the town to the outside world. I believe this was a mistake.
Attachments
Runcorn.jpg
How would you like your grade separations, Sir?
Big and complex.
User avatar
wrinkly
Member
Posts: 8986
Joined: Tue Mar 04, 2008 12:17
Location: Leeds

Re: M56 new Junction 11a

Post by wrinkly »

Was something complicated once proposed where the Southern Expressway carriageways split over Beechwood Avenue?

Again a bit further east they seem to splay more than the minimum needed for future completion of the incomplete GSJ with Murdishaw Ave.
User avatar
Bryn666
Elected Committee Member
Posts: 35755
Joined: Thu Jun 20, 2002 20:54
Contact:

Re: M56 new Junction 11a

Post by Bryn666 »

I thought that was just because of the pylons myself, or perhaps poor ground conditions.
Bryn
Terminally cynical, unimpressed, and nearly Middle Age already.
She said life was like a motorway; dull, grey, and long.

Blog - https://showmeasign.online/
X - https://twitter.com/ShowMeASignBryn
YouTube - https://www.youtube.com/@BrynBuck
User avatar
PeterA5145
Member
Posts: 25347
Joined: Sun Mar 24, 2002 00:19
Location: Stockport, Cheshire
Contact:

Re: M56 new Junction 11a

Post by PeterA5145 »

Truvelo wrote:The problem with new towns in general is the expressways were designed to move traffic within the town but not to connect the town to the outside world. I believe this was a mistake.
It was assumed that most new town residents would work within the towns, which didn't turn out to be the case.

Runcorn has never had a decent link to the M56 to the east - it has always involved either going out of your way or going through Preston Brook village.
“The human race divides politically into those who want people to be controlled and those who have no such desire.” – Robert A. Heinlein
User avatar
wrinkly
Member
Posts: 8986
Joined: Tue Mar 04, 2008 12:17
Location: Leeds

Re: M56 new Junction 11a

Post by wrinkly »

There are descriptions of the two options in a new press release:

https://www.gov.uk/government/news/info ... nction-11a

No doubt plans will appear on 6 Sep.
User avatar
Nicholas
Member
Posts: 4695
Joined: Sun Jun 25, 2006 18:37
Location: Bournemouth
Contact:

Re: M56 new Junction 11a

Post by Nicholas »

Would it not make sense to renumber J12 to J13 and call the new juntion J12?
Voie Rapide / Mótarbhealaí
Updated 1 November 2019!
User avatar
Chris5156
Deputy Treasurer
Posts: 16908
Joined: Thu Sep 06, 2001 21:50
Location: Hampshire
Contact:

Re: M56 new Junction 11a

Post by Chris5156 »

wrinkly wrote:There are descriptions of the two options in a new press release:

https://www.gov.uk/government/news/info ... nction-11a

No doubt plans will appear on 6 Sep.
It sounds like both options will have a westbound off-slip leading to a new roundabout on the south side of the M56, and the difference between the two is that one option will have the eastbound on-slip starting on the Southern Expressway roundabout and the other will fly over it using the existing provision for a flyover.
User avatar
si404
Member
Posts: 10885
Joined: Sat May 31, 2003 13:25
Location: Amersham

Re: M56 new Junction 11a

Post by si404 »

Nicholas wrote:Would it not make sense to renumber J12 to J13 and call the new juntion J12?
When have we ever done something sensible like that? Oh wait, when the M60 was created and J14, 14A and 15 of the M62 became J14, 15 and 16 of the M60. Sound the alarms - there's precedent!
"“Peace, commerce and honest friendship with all nations" Thomas Jefferson
User avatar
jackal
Member
Posts: 7549
Joined: Tue Jan 08, 2008 23:33
Location: M6

Re: M56 new Junction 11a

Post by jackal »

It says one option is to the east of the WCML, the other to the west. As I'm not familiar with rail terminology I'm not entirely sure if they mean the Liverpool branch or the WCML proper. The natural reading would be WCML proper but that's further away from the expected site of the junction and would mean the 'east' option for the new junction will overlap with J11, requiring either braiding (unlikely) or slip closures (with replacement west-facers). So maybe they mean the branch?
User avatar
wrinkly
Member
Posts: 8986
Joined: Tue Mar 04, 2008 12:17
Location: Leeds

Re: M56 new Junction 11a

Post by wrinkly »

In rail circles both broad and narrow conventions exist for naming the WCML; my impression is that the broad one is gaining ground.
User avatar
PeterA5145
Member
Posts: 25347
Joined: Sun Mar 24, 2002 00:19
Location: Stockport, Cheshire
Contact:

Re: M56 new Junction 11a

Post by PeterA5145 »

I popped along to have a look at this earlier today. There weren't any handouts available, but they said the maps would be up on the website either today or tomorrow.

Both options are rather inelegant and come across as a bit of a dog's dinner, although I suppose they are constrained by land ownership issues and the existing development patterns. The "Eastern" option, which looks cheaper and I suspect is the one they will go for, turns the existing roundabout into a hamburger, with a slip continuing directly on to the eastbound M56, although the opposite movement comes off at a mini-roundabout and uses the existing bridge to reach the southern entrance to the roundabout.

The "Western" option involves building a new roundabout a couple of hundred yards west of the existing one, with a new link road then running south under the railway line to a new roundabout junction on the motorway. This looks more expensive and requires more land take, and involves negotiating two or even three roundabouts for every movement.

Both include full access to the M56 to the west as well as the east. A preferred option will be announced next Spring with completion planned for 2021.

I said on the comment form that it was a pity they couldn't use the provision for grade separation to give free-flow access to and from the M56 to the east :|
“The human race divides politically into those who want people to be controlled and those who have no such desire.” – Robert A. Heinlein