Worcester Southern Link Road dualling (A4440)

The study of British and Irish roads - their construction, numbering, history, mapping, past and future official roads proposals and general roads musings.

There is a separate forum for Street Furniture (traffic lights, street lights, road signs etc).

Registered users get access to other forums including discussions about other forms of transport, driving, fantasy roads and wishlists, and roads quizzes.

Moderator: Site Management Team

User avatar
mapboy
Member
Posts: 1111
Joined: Sat Oct 29, 2011 08:53
Location: Birmingham

Re: Worcester Southern Link Road dualling (A4440)

Post by mapboy »

It would appear that part of the improvements being constructed includes the introduction of 40mph limits around the roundabouts, supposedly for safety purposes; also the dual-carriageway will remain at 60mph rather than following NSL. I don't understand the need for the 40 limits - by nature the speed limit is self-enforcing as one has to slow for the roundabouts. :?
Jeni
Banned
Posts: 7313
Joined: Sun Nov 28, 2004 22:28

Re: Worcester Southern Link Road dualling (A4440)

Post by Jeni »

Progress as of last week...

All lanes that are due to be opened for this part of the works are now open - 2 down the hill, 1 up with D2 either side of the railway bridge.

Supposedly widening the railway bridge is due to start this summer.

User avatar
wrinkly
Member
Posts: 8988
Joined: Tue Mar 04, 2008 12:17
Location: Leeds

Re: Worcester Southern Link Road dualling (A4440)

Post by wrinkly »

User avatar
wrinkly
Member
Posts: 8988
Joined: Tue Mar 04, 2008 12:17
Location: Leeds

Re: Worcester Southern Link Road dualling (A4440)

Post by wrinkly »

I found this post on the Rail UK forums:

https://www.railforums.co.uk/threads/wo ... ge.162726/
pthomas
Member
Posts: 42
Joined: Mon Sep 22, 2008 16:10
Location: Worcestershire

Re: Worcester Southern Link Road dualling (A4440)

Post by pthomas »

The county council has published an animation showing the plans for installing the new railway bridge

https://youtu.be/2iLN5vLj6Gs
User avatar
jackal
Member
Posts: 7549
Joined: Tue Jan 08, 2008 23:33
Location: M6

Re: Worcester Southern Link Road dualling (A4440)

Post by jackal »

The first three phases of this scheme are complete, so the A4440 is dualled between the Whittington (A44) and Ketch (A38) roundabouts. Phase 4, taking the dualling up to Powick roundabout (A449) and completing the scheme, is due to complete in Spring 2022.

It's pretty impressive for a local authority project with several major structures, including at the railway and Severn. As mentioned above, speed limits generally seem to be 60mph with 40mph at the roundabouts, which is more a novelty than a real hindrance IMO.

There were some funny little west facing GSJs for property access on the single carriageway bypass that are retained in revised form going by the video.



https://www.worcestershire.gov.uk/info/ ... provements
Last edited by jackal on Mon Apr 12, 2021 16:51, edited 1 time in total.
User avatar
Truvelo
Member
Posts: 17467
Joined: Wed May 29, 2002 21:10
Location: Staffordshire
Contact:

Re: Worcester Southern Link Road dualling (A4440)

Post by Truvelo »

There's such a reluctance for local authority schemes to be NSL these days :@
How would you like your grade separations, Sir?
Big and complex.
User avatar
Norfolktolancashire
Member
Posts: 1185
Joined: Tue Apr 17, 2007 22:34
Location: Cornwall

Re: Worcester Southern Link Road dualling (A4440)

Post by Norfolktolancashire »

Truvelo wrote: Mon Apr 12, 2021 16:20 There's such a reluctance for local authority schemes to be NSL these days :@
Is it due to some of the road schemes built by them are of such design that they would not be "safe" for NSL?

These are cheaper to construct and therefore more likely to get the relevant go ahead from the finance side of things.

An example is the A6 just north of Preston, the recently opened Broughton bypass. This D2 has been constructed without any central barrier and is 40mph.

https://www.google.co.uk/maps/@53.80737 ... 312!8i6656
User avatar
jackal
Member
Posts: 7549
Joined: Tue Jan 08, 2008 23:33
Location: M6

Re: Worcester Southern Link Road dualling (A4440)

Post by jackal »

For the A4440 I think they may have kept some of the old alignment as eastbound carriageway, which would explain the 60mph limit.
User avatar
mapboy
Member
Posts: 1111
Joined: Sat Oct 29, 2011 08:53
Location: Birmingham

Re: Worcester Southern Link Road dualling (A4440)

Post by mapboy »

jackal wrote: Tue Apr 13, 2021 07:09 For the A4440 I think they may have kept some of the old alignment as eastbound carriageway, which would explain the 60mph limit.
That certainly was the case for some of the earlier parts of the scheme. Before the new railway bridge was constructed the new westbound carriageway started/finished either side of embankment whilst traffic used what is now the eastbound carriageway.
Fenlander
Member
Posts: 7801
Joined: Fri Mar 26, 2010 21:54
Location: south Lincolnshire

Re: Worcester Southern Link Road dualling (A4440)

Post by Fenlander »

Norfolktolancashire wrote: Mon Apr 12, 2021 22:10
Truvelo wrote: Mon Apr 12, 2021 16:20 There's such a reluctance for local authority schemes to be NSL these days :@
Is it due to some of the road schemes built by them are of such design that they would not be "safe" for NSL?

These are cheaper to construct and therefore more likely to get the relevant go ahead from the finance side of things.

An example is the A6 just north of Preston, the recently opened Broughton bypass. This D2 has been constructed without any central barrier and is 40mph.

https://www.google.co.uk/maps/@53.80737 ... 312!8i6656
The tactile paving makes me wince.
User avatar
Norfolktolancashire
Member
Posts: 1185
Joined: Tue Apr 17, 2007 22:34
Location: Cornwall

Re: Worcester Southern Link Road dualling (A4440)

Post by Norfolktolancashire »

Fenlander wrote: Wed Apr 14, 2021 23:14
Norfolktolancashire wrote: Mon Apr 12, 2021 22:10
Truvelo wrote: Mon Apr 12, 2021 16:20 There's such a reluctance for local authority schemes to be NSL these days :@
Is it due to some of the road schemes built by them are of such design that they would not be "safe" for NSL?

These are cheaper to construct and therefore more likely to get the relevant go ahead from the finance side of things.

An example is the A6 just north of Preston, the recently opened Broughton bypass. This D2 has been constructed without any central barrier and is 40mph.

https://www.google.co.uk/maps/@53.80737 ... 312!8i6656
The tactile paving makes me wince.
It will be an interesting foot crossing, particularly later at night when the boy racers are out!
User avatar
Big L
Deputy Site Manager
Posts: 7517
Joined: Sun Nov 14, 2010 20:36
Location: B5012

Re: Worcester Southern Link Road dualling (A4440)

Post by Big L »

I passed this way today and cant believe the progress since last time 6 months ago. The parallel bridge across the Severn has sprung up from nothing and looks almost complete barring the blacktop. Ditto most of the section of the second carriageway west of the bridge; westbound traffic is on the new carriageway for the last few hundred metres towards the A449 junction.
Make poetry history.

Did you know there's more to SABRE than just the Forums?
Help with maps using the new online calibrator.
Add your roads knowledge to the SABRE Wiki.
User avatar
IAN
Member
Posts: 1494
Joined: Thu Dec 20, 2001 19:07

Re: Worcester Southern Link Road dualling (A4440)

Post by IAN »

The final section to be dualled has now been opened with just a little work remaining on the junctions.

https://www.worcesternews.co.uk/news/20 ... irst-time/
AKA M5 Driver
User avatar
chaseracer
Member
Posts: 236
Joined: Sun Oct 05, 2014 15:46
Location: 127.0.0.1

Re: Worcester Southern Link Road dualling (A4440)

Post by chaseracer »

FINALLY!!
User avatar
AAndy
Member
Posts: 3872
Joined: Thu May 12, 2005 20:28

Re: Worcester Southern Link Road dualling (A4440)

Post by AAndy »

Video I took this week. https://youtu.be/K4t-ozX5gNY

Both directions, short version , just of the new section.

The pylon island is interesting on the exit to worcester at the eastern roundabout.
User avatar
Owain
Elected Committee Member
Posts: 26209
Joined: Fri Aug 21, 2009 17:02
Location: Leodis

Re: Worcester Southern Link Road dualling (A4440)

Post by Owain »

I drove the newly dualled sections all the way from the M5 to the A449 a couple of weeks ago. Oh my goodness - what a difference!

A decade ago I was working in Worcester, and that southern ring was an absolute nightmare during morning and evening rush hours. They've done a really good job there.
Former President & F99 Driver

Viva la Repubblica!
Herned
Member
Posts: 1363
Joined: Thu Jul 20, 2017 09:15

Re: Worcester Southern Link Road dualling (A4440)

Post by Herned »

Why isn't it the A44 though? Because it wasn't built in one go?
User avatar
Owain
Elected Committee Member
Posts: 26209
Joined: Fri Aug 21, 2009 17:02
Location: Leodis

Re: Worcester Southern Link Road dualling (A4440)

Post by Owain »

Herned wrote: Wed Aug 31, 2022 21:32 Why isn't it the A44 though? Because it wasn't built in one go?
You could probably ask the same question of roads like the A500 (why not A34?), the A563 (why not A47?), the A6177 (why not A650?), the A1139 (why not A15 or A16?).

I assume that the answer stems from a desire to create a coherent ring road with its own identity, rather than making them part of a through route.
Former President & F99 Driver

Viva la Repubblica!
User avatar
IAN
Member
Posts: 1494
Joined: Thu Dec 20, 2001 19:07

Re: Worcester Southern Link Road dualling (A4440)

Post by IAN »

Now there's just the small matter of linking here https://www.google.com/maps/@52.1890657 ... 384!8i8192 with here https://www.google.com/maps/@52.2310338 ... 384!8i8192 and we'll have a useful outer ring road for Worcester!
AKA M5 Driver