Richardf
Member
Posts: 1714
Joined: Wed Dec 06, 2006 10:19
Location: Dorchester
Contact:

Re: A358 Taunton to Southfields

Post by Richardf »

Peter350 wrote: Sun Aug 11, 2019 00:03
hoagy_ytfc wrote:
A pedant writes....

The A37 doesn't go to Weymouth.
It used to, before the great numbering revision of 1935 which saw the bit south of Dorchester become the A354 to ‘provide a coherent route number towards London’. The planners of that time obviously didn’t have the crystal ball to realise that it would eventually become redundant as a strategic route due to the construction of the M3 and M27, which in turn made the A31/A35 a much better candidate for upgrading. In this day and age, the Dorchester - Weymouth road ought to revert back to A37 again to reflect its strategic importance for traffic heading to Bristol and the West Country, as well as much of Wales.
Agree, A37 would be a good number for Weymouth-Yeovil- A303. Leave Portland out, that could be served by an extended A353.
My latest Road Photos https://flic.kr/s/aHsktQHcMB
User avatar
Peter350
Member
Posts: 803
Joined: Thu Jan 25, 2018 20:20
Location: Southampton

Re: A358 Taunton to Southfields

Post by Peter350 »

Richardf wrote: Sun Aug 11, 2019 16:59
Peter350 wrote: Sun Aug 11, 2019 00:03
hoagy_ytfc wrote:
A pedant writes....

The A37 doesn't go to Weymouth.
It used to, before the great numbering revision of 1935 which saw the bit south of Dorchester become the A354 to ‘provide a coherent route number towards London’. The planners of that time obviously didn’t have the crystal ball to realise that it would eventually become redundant as a strategic route due to the construction of the M3 and M27, which in turn made the A31/A35 a much better candidate for upgrading. In this day and age, the Dorchester - Weymouth road ought to revert back to A37 again to reflect its strategic importance for traffic heading to Bristol and the West Country, as well as much of Wales.
Agree, A37 would be a good number for Weymouth-Yeovil- A303. Leave Portland out, that could be served by an extended A353.
Don’t forget that the A353 now terminates on the Weymouth Relief Road at the Jurassic Roundabout. If you plan to extend it further south, you’ll have to terminate the Dorchester - Weymouth route number (whether it’s A37 or A354) there, unless you intend to create a useless multiplex as far as Weymouth town centre which is a pretty bizarre idea IMO. Better to have the Dorchester to Portland route as a single road number since it makes more strategic sense.
Richardf
Member
Posts: 1714
Joined: Wed Dec 06, 2006 10:19
Location: Dorchester
Contact:

Re: A358 Taunton to Southfields

Post by Richardf »

Bump.
My latest Road Photos https://flic.kr/s/aHsktQHcMB
SteveA30
Member
Posts: 6015
Joined: Fri May 06, 2005 12:52
Location: Dorset

Re: A358 Taunton to Southfields

Post by SteveA30 »

https://www.bridgwatermercury.co.uk/new ... o_AoRpzCJM

Extra added complication at J25 now. How long before the Henlade bypass is connected to it.
Roads and holidays in the west, before motorways.
http://trektothewest.shutterfly.com
http://holidayroads.webs.com/
Richardf
Member
Posts: 1714
Joined: Wed Dec 06, 2006 10:19
Location: Dorchester
Contact:

Re: A358 Taunton to Southfields

Post by Richardf »

SteveA30 wrote: Thu Jan 14, 2021 11:40 https://www.bridgwatermercury.co.uk/new ... o_AoRpzCJM

Extra added complication at J25 now. How long before the Henlade bypass is connected to it.
Looks a right mess.
My latest Road Photos https://flic.kr/s/aHsktQHcMB
A320Driver
Member
Posts: 448
Joined: Fri Jun 24, 2005 19:11
Location: Leatherhead

Re: A358 Taunton to Southfields

Post by A320Driver »

Richardf wrote: Thu Jan 14, 2021 12:45
SteveA30 wrote: Thu Jan 14, 2021 11:40 https://www.bridgwatermercury.co.uk/new ... o_AoRpzCJM

Extra added complication at J25 now. How long before the Henlade bypass is connected to it.
Looks a right mess.
Yep, and that’s before a strategic road from the South and South East slams into the roundabout. It’s a mix of local, regional and strategic traffic.

Something like this would be better. Two bridges and a D2 across farmland is all that’s needed.
F203A028-A45B-4300-805F-A43951A4A7E5.jpeg
Formerly ‘guvvaA303’
User avatar
jackal
Member
Posts: 7545
Joined: Tue Jan 08, 2008 23:33
Location: M6

Re: A358 Taunton to Southfields

Post by jackal »

^
The preferred route actually started life looking like that. It was the most popular option in the 2018 consultation. Then in a classic Highways England move they removed the two freeflow junctions, plugged everything into the new development roundabout and called the resulting monstrosity the preferred route. They're currently finalising the contract with Taylor Woodrow without the public being consulted on anything like the proposed design.

Consultation (see Pink option): https://highwaysengland.citizenspace.co ... nedOff.pdf
PRA: https://highwaysengland.citizenspace.co ... .06.19.pdf
Richardf
Member
Posts: 1714
Joined: Wed Dec 06, 2006 10:19
Location: Dorchester
Contact:

Re: A358 Taunton to Southfields

Post by Richardf »

jackal wrote: Thu Jan 14, 2021 15:57 ^
The preferred route actually started life looking like that. It was the most popular option in the 2018 consultation. Then in a classic Highways England move they removed the two freeflow junctions, plugged everything into the new development roundabout and called the resulting monstrosity the preferred route. They're currently finalising the contract with Taylor Woodrow without the public being consulted on anything like the proposed design.

Consultation (see Pink option): https://highwaysengland.citizenspace.co ... nedOff.pdf
PRA: https://highwaysengland.citizenspace.co ... .06.19.pdf
So basically its Pink without the freeflow bit between junctions A and B? Shocking. Athough I suppose it does leave the door open for freeflow improvement at a later date. Once they realise the current plans are inadequate and becomes hopelessly congested!
My latest Road Photos https://flic.kr/s/aHsktQHcMB
User avatar
SouthWest Philip
Member
Posts: 3478
Joined: Sun Mar 31, 2002 19:35
Location: Evesham, Worcestershire

Re: A358 Taunton to Southfields

Post by SouthWest Philip »

Richardf wrote: Thu Jan 14, 2021 12:45
SteveA30 wrote: Thu Jan 14, 2021 11:40 https://www.bridgwatermercury.co.uk/new ... o_AoRpzCJM

Extra added complication at J25 now. How long before the Henlade bypass is connected to it.
Looks a right mess.
Indeed. Given what they've done, it would actually be better to close off the old A358(E) connection from the jnc 25 roundabout altogether.
User avatar
jackal
Member
Posts: 7545
Joined: Tue Jan 08, 2008 23:33
Location: M6

Re: A358 Taunton to Southfields

Post by jackal »

Richardf wrote: Thu Jan 14, 2021 16:32 So basically its Pink without the freeflow bit between junctions A and B? Shocking.
Exactly.
Herned
Member
Posts: 1363
Joined: Thu Jul 20, 2017 09:15

Re: A358 Taunton to Southfields

Post by Herned »

jackal wrote: Thu Jan 14, 2021 15:57 The preferred route actually started life looking like that. It was the most popular option in the 2018 consultation. Then in a classic Highways England move they removed the two freeflow junctions, plugged everything into the new development roundabout and called the resulting monstrosity the preferred route. They're currently finalising the contract with Taylor Woodrow without the public being consulted on anything like the proposed design.
Taylor Woodrow? Is that really right? They don't normally build major roads do they?
User avatar
jackal
Member
Posts: 7545
Joined: Tue Jan 08, 2008 23:33
Location: M6

Re: A358 Taunton to Southfields

Post by jackal »

Herned wrote: Thu Jan 14, 2021 21:35Taylor Woodrow? Is that really right? They don't normally build major roads do they?
They have been one of HE's major contractors for the south west for a couple of years so I expect they will take on a few schemes coming through in the region. Also this is the civil engineering division that was sold to Vinci some years ago, rather than the better known housebuilder Taylor Wimpey plc.

Anyway, from the scheme page:
27 November 2020

Early works on the scheme’s preliminary design progressing

We are pleased to be able to confirm that the A358 scheme has now been allocated to Taylor Woodrow following a competitive tender process through the Regional Delivery Partnerships framework.

We are now in the process of finalising the scheme contract with Taylor Woodrow, which is scheduled to be awarded early next year. Taylor Woodrow are also progressing early works on the scheme’s preliminary design.
User avatar
AAndy
Member
Posts: 3869
Joined: Thu May 12, 2005 20:28

Re: A358 Taunton to Southfields

Post by AAndy »

Traffic jam time soon?
Attachments
January 2021
January 2021
Richardf
Member
Posts: 1714
Joined: Wed Dec 06, 2006 10:19
Location: Dorchester
Contact:

Re: A358 Taunton to Southfields

Post by Richardf »

Richardf wrote: Thu Jan 14, 2021 12:45
SteveA30 wrote: Thu Jan 14, 2021 11:40 https://www.bridgwatermercury.co.uk/new ... o_AoRpzCJM

Extra added complication at J25 now. How long before the Henlade bypass is connected to it.
Looks a right mess.
M5 J25 to M5 J29: "Hold my beer!"
My latest Road Photos https://flic.kr/s/aHsktQHcMB
User avatar
Norfolktolancashire
Member
Posts: 1185
Joined: Tue Apr 17, 2007 22:34
Location: Cornwall

Re: A358 Taunton to Southfields

Post by Norfolktolancashire »

AAndy wrote: Fri Jan 15, 2021 09:29 Traffic jam time soon?
Exactly!

How many lanes can you put on a roundabout?!
User avatar
vlad
Member
Posts: 2586
Joined: Tue May 13, 2008 16:20
Location: Near the northern end of the A34

Re: A358 Taunton to Southfields

Post by vlad »

Norfolktolancashire wrote: Sat Jan 16, 2021 19:54 How many lanes can you put on a roundabout?!
Six (M40 J9)?

I'll admit that not all of them go all the way round.
"If you expect nothing from somebody you are never disappointed." - Sylvia Plath
User avatar
Chris5156
Deputy Treasurer
Posts: 16908
Joined: Thu Sep 06, 2001 21:50
Location: Hampshire
Contact:

Re: A358 Taunton to Southfields

Post by Chris5156 »

vlad wrote: Sat Jan 16, 2021 20:09
Norfolktolancashire wrote: Sat Jan 16, 2021 19:54 How many lanes can you put on a roundabout?!
Six (M40 J9)?

I'll admit that not all of them go all the way round.
I see your six and raise you seven at Hanger Lane.
User avatar
owen b
Member
Posts: 9859
Joined: Sun Mar 16, 2003 15:22
Location: Luton

Re: A358 Taunton to Southfields

Post by owen b »

Chris5156 wrote: Sun Jan 17, 2021 15:45
vlad wrote: Sat Jan 16, 2021 20:09
Norfolktolancashire wrote: Sat Jan 16, 2021 19:54 How many lanes can you put on a roundabout?!
Six (M40 J9)?

I'll admit that not all of them go all the way round.
I see your six and raise you seven at Hanger Lane.
If you go to the aerial view there's a short stretch at Hanger Lane that's eight lanes :o .
Owen
User avatar
AAndy
Member
Posts: 3869
Joined: Thu May 12, 2005 20:28

Re: A358 Taunton to Southfields

Post by AAndy »

New M5 Junction Roundabout exit roundabout on the A358 Southbound now open.

Video here: https://youtu.be/piodNBdZjcs

I must just mention, I think the quality of the work and the design is of a very high standard here, the alignment and layout of the road/lanes etc is better than normal - having also used the works on the north side for a while too. Well done.
DavidBrown
Member
Posts: 8398
Joined: Sun May 29, 2005 00:35

Re: A358 Taunton to Southfields

Post by DavidBrown »

Whilst I dislike how the scheme is just to open up new developments, and how it sends the A358 on a roundabout route (albeit only planned to be for the short term), the thing that I hate the most about the scheme? The signage - absolute dross. Taunton's never been great at its signage, but the new stuff going in here is just the absolute bottom of the pile rubbish, both what I saw in person before lockdown and what I can see in the video. Just don't show Bryn!

Somewhat off topic, but the upgrade to the VMS on the M5 appear to finally be progressing. There was still no sign of anything other than a bit of dirt dug up here and there last time I went up that way - now the sign frames appear to be up. Interesting to see the posts at the on-slip are for AMI's rather than MS1's - I don't think that VSL is planned for the M5, but may have missed something?