- £400 million over the next 5 years (RP2)
- £218 million of that will be used to demolish existing concrete road surfaces that are in a poor condition and replace with a new smoother surface. Doesn't specify replacement as concrete or tarmac, although I'd imagine it to be the latter.
- £67 million of that will be used to repair and maximise the life of existing concrete roads.
- £37 million of that will be for Design Framework
- Parts of the A12 & A11 will be done this Summer/Spring
I'm hoping the remaining concrete sections of the M25 can be replaced!