User avatar
Bryn666
Elected Committee Member
Posts: 35755
Joined: Thu Jun 20, 2002 20:54
Contact:

Re: Lofthouse Junction Upgrade Consultation

Post by Bryn666 »

I like it - you could probably fit it in under 120km/h design speed with a couple of departures for maybe offside lane narrowing and it would still be a damn sight more efficient and safe than what's there now.

Given it's D5M at present and given NH don't care about hard shoulders being present either, a decent concrete barrier between C/D lanes akin to the M20 at Maidstone seems extremely achievable. Good luck finding anyone competent to do the direction signs, you'll have some hideous gantries spat out :laugh:
Bryn
Terminally cynical, unimpressed, and nearly Middle Age already.
She said life was like a motorway; dull, grey, and long.

Blog - https://showmeasign.online/
X - https://twitter.com/ShowMeASignBryn
YouTube - https://www.youtube.com/@BrynBuck
User avatar
Owain
Elected Committee Member
Posts: 26212
Joined: Fri Aug 21, 2009 17:02
Location: Leodis

Re: Lofthouse Junction Upgrade Consultation

Post by Owain »

I like it too! Ambitious, yet practical....

To be fair to the existing structure, I've never found any of the various movements nor the proximity of the M1-M62 and M1-M621 interchanges to be either dangerous or particularly bad for delays, but a junction like Lofthouse really shouldn't be using roundabouts.
Former President & F99 Driver

Viva la Repubblica!
User avatar
c2R
SABRE Wiki admin
Posts: 11162
Joined: Fri Jul 05, 2002 11:01

Re: Lofthouse Junction Upgrade Consultation

Post by c2R »

Owain wrote: Tue Nov 02, 2021 10:41 I like it too! Ambitious, yet practical....

To be fair to the existing structure, I've never found any of the various movements nor the proximity of the M1-M62 and M1-M621 interchanges to be either dangerous or particularly bad for delays, but a junction like Lofthouse really shouldn't be using roundabouts.
It's bad particularly heading southbound at rush hour - lots of weaving and conflicting movements causing accidents and delay - although I suspect part of the cause are the queues for the roundabout itself tailing back to the main line.
Is there a road improvement project going on near you? Help us to document it on the SABRE Wiki - help is available in the Digest forum.
Have you browsed SABRE Maps recently? Get involved! - see our guide to scanning and stitching maps
User avatar
Owain
Elected Committee Member
Posts: 26212
Joined: Fri Aug 21, 2009 17:02
Location: Leodis

Re: Lofthouse Junction Upgrade Consultation

Post by Owain »

c2R wrote: Tue Nov 02, 2021 10:44
Owain wrote: Tue Nov 02, 2021 10:41 I like it too! Ambitious, yet practical....

To be fair to the existing structure, I've never found any of the various movements nor the proximity of the M1-M62 and M1-M621 interchanges to be either dangerous or particularly bad for delays, but a junction like Lofthouse really shouldn't be using roundabouts.
It's bad particularly heading southbound at rush hour - lots of weaving and conflicting movements causing accidents and delay - although I suspect part of the cause are the queues for the roundabout itself tailing back to the main line.
My most common direction would be M62 from W to M1 S - the queues can stack up there, but never quite seem to reach back as far as the M62 mainline, or the freefrow M62-M1 slip.

But certainly the roundabout has to go. I'm struggling to think of any other country in Europe that uses roundabouts on motorways, apart from Ireland and the Netherlands (where I think most of the ones that were there have now been removed).
Former President & F99 Driver

Viva la Repubblica!
User avatar
Bryn666
Elected Committee Member
Posts: 35755
Joined: Thu Jun 20, 2002 20:54
Contact:

Re: Lofthouse Junction Upgrade Consultation

Post by Bryn666 »

Owain wrote: Tue Nov 02, 2021 10:51
c2R wrote: Tue Nov 02, 2021 10:44
Owain wrote: Tue Nov 02, 2021 10:41 I like it too! Ambitious, yet practical....

To be fair to the existing structure, I've never found any of the various movements nor the proximity of the M1-M62 and M1-M621 interchanges to be either dangerous or particularly bad for delays, but a junction like Lofthouse really shouldn't be using roundabouts.
It's bad particularly heading southbound at rush hour - lots of weaving and conflicting movements causing accidents and delay - although I suspect part of the cause are the queues for the roundabout itself tailing back to the main line.
My most common direction would be M62 from W to M1 S - the queues can stack up there, but never quite seem to reach back as far as the M62 mainline, or the freefrow M62-M1 slip.

But certainly the roundabout has to go. I'm struggling to think of any other country in Europe that uses roundabouts on motorways, apart from Ireland and the Netherlands (where I think most of the ones that were there have now been removed).
The Dutch examples were always stop-gap measures pending traffic need, the final 'original' roundabout at Joure has since been replaced with a big directional-T. There are still a few diamonds connecting two motorways though - a notorious example being the A27/A59 here: https://goo.gl/maps/nyp1udV3QBZqkqAK9
Bryn
Terminally cynical, unimpressed, and nearly Middle Age already.
She said life was like a motorway; dull, grey, and long.

Blog - https://showmeasign.online/
X - https://twitter.com/ShowMeASignBryn
YouTube - https://www.youtube.com/@BrynBuck
Paul7755
Member
Posts: 190
Joined: Mon Jul 11, 2016 11:59
Location: Hampshire

Re: Lofthouse Junction Upgrade Consultation

Post by Paul7755 »

Would the timeline be such that A1(M) works around Doncaster etc would be completed in advance of this?
User avatar
Bryn666
Elected Committee Member
Posts: 35755
Joined: Thu Jun 20, 2002 20:54
Contact:

Re: Lofthouse Junction Upgrade Consultation

Post by Bryn666 »

Paul7755 wrote: Tue Nov 02, 2021 13:27 Would the timeline be such that A1(M) works around Doncaster etc would be completed in advance of this?
I would be willing to wager that since doing anything major around Doncaster will require land purchase and extensive Development Consent Order work, whereas this Lofthouse scheme could be underway within 3 years if it was fast tracked (no land purchase for one, the time consumption is detailed design and construction phasing), that no.
Bryn
Terminally cynical, unimpressed, and nearly Middle Age already.
She said life was like a motorway; dull, grey, and long.

Blog - https://showmeasign.online/
X - https://twitter.com/ShowMeASignBryn
YouTube - https://www.youtube.com/@BrynBuck
M19
Member
Posts: 2249
Joined: Mon Dec 24, 2001 05:00
Location: Rothwell, Northants

Re: Lofthouse Junction Upgrade Consultation

Post by M19 »

Option C is the obvious answer. As we’re talking highway planning in a UK context, option A will be chosen with awful roundabout entry path overlap generating geometries thrown in for good measure.

I hope I’m wrong.
M19
User avatar
Owain
Elected Committee Member
Posts: 26212
Joined: Fri Aug 21, 2009 17:02
Location: Leodis

Re: Lofthouse Junction Upgrade Consultation

Post by Owain »

Bryn666 wrote: Tue Nov 02, 2021 11:40
Owain wrote: Tue Nov 02, 2021 10:51 My most common direction would be M62 from W to M1 S - the queues can stack up there, but never quite seem to reach back as far as the M62 mainline, or the freefrow M62-M1 slip.

But certainly the roundabout has to go. I'm struggling to think of any other country in Europe that uses roundabouts on motorways, apart from Ireland and the Netherlands (where I think most of the ones that were there have now been removed).
The Dutch examples were always stop-gap measures pending traffic need, the final 'original' roundabout at Joure has since been replaced with a big directional-T. There are still a few diamonds connecting two motorways though - a notorious example being the A27/A59 here: https://goo.gl/maps/nyp1udV3QBZqkqAK9
Shocker!.... I've never noticed that one before.
Former President & F99 Driver

Viva la Repubblica!
User avatar
JammyDodge
Member
Posts: 485
Joined: Sat Oct 13, 2018 13:17

Re: Lofthouse Junction Upgrade Consultation

Post by JammyDodge »

jackal wrote: Tue Nov 02, 2021 09:25
JammyDodge wrote: Mon Nov 01, 2021 20:52
jackal wrote: Mon Nov 01, 2021 14:44 we can all at last retire our Lofthouse crayons
I got the crayons out

J42-43 theoretical braiding solution
M1 J42-43 Braid.jpg
Just when I thought I was out, they pull me back in.

Your sketch has the right idea but it has mainline weaving north of M1 J43 on both M1 and M621, and it also severs access from the M1 to M621 J7. This plan resolves these issues:


M1 M621 - Copy.JPG


The basic concept is the same as yours, i.e., (1) remove the M1 TOTSO and (2) resolve route choice at Lofthouse (J42) north of J43. So the section between J42 and J43 consists of the M1 mainline (inner carriageways) and extended slips from Lofthouse (outercarriageways). But there are also C/D lanes (M1) and braiding (M621) north of J43 to handle weaving there while maintaining full access.

It might actually be possible to fit all of the C/D lanes under existing bridges, which have a decent amount of space, though the speed limit may have to be dropped in places as sightlines would suffer. The M1 J43 to J44 C/D lanes would just be 2+2, so fit under the Wakefield road bridge, which is D3M plus verge. J42 to J43 definitely fits for 3+2, accommodating two lanes for the turning movements at Lofthouse as at present. (3+3, allowing three lanes for the turning movements, might require the Sharp Lane bridge to be replaced, though I'm not convinced the extra lane is actually needed if weaving issues are resolved.)

J43 itself would need one new bridge (the existing bridge is the other bridge needed there) and two more are required for the braiding north of there. So though this looks very complex it may require only three new bridges, and the only significant landtake is for J43 and the braiding north of there.
Pretty much perfect in layout

I would make it quad 3 lane with shoulder from J42-43, which maintains the M1's 3 lanes through the junction and allows 4 into 3 at J42 on the collector (could be an extension of the M621?)
Would require the rebuild the Sharp Lane bridge and extensions of the ones over the A654

If it was designed compactly, it would also be feasible to build wholly withing NH's existing land
Designing Tomorrow, Around the Past
Fluid Dynamics
Member
Posts: 983
Joined: Sun Apr 14, 2002 19:54

Re: Lofthouse Junction Upgrade Consultation

Post by Fluid Dynamics »

Owain wrote: Tue Nov 02, 2021 21:38
Bryn666 wrote: Tue Nov 02, 2021 11:40
Owain wrote: Tue Nov 02, 2021 10:51 My most common direction would be M62 from W to M1 S - the queues can stack up there, but never quite seem to reach back as far as the M62 mainline, or the freefrow M62-M1 slip.

But certainly the roundabout has to go. I'm struggling to think of any other country in Europe that uses roundabouts on motorways, apart from Ireland and the Netherlands (where I think most of the ones that were there have now been removed).
The Dutch examples were always stop-gap measures pending traffic need, the final 'original' roundabout at Joure has since been replaced with a big directional-T. There are still a few diamonds connecting two motorways though - a notorious example being the A27/A59 here: https://goo.gl/maps/nyp1udV3QBZqkqAK9
Shocker!.... I've never noticed that one before.
I've been over that on the A27 and never realised what was underneath.

The Dutch have sorted most of the mad at grade stuff now, the A2/A67 roundabout and as Bryn says the A6/A7 roundabout are new gone. Last time I was there they had also tidied up the roads around Leeuwarden, but seem to continually tinker with the A7/N7 around Groningen.
User avatar
the cheesecake man
Member
Posts: 2462
Joined: Mon Jan 07, 2019 13:21
Location: Sheffield

Re: Lofthouse Junction Upgrade Consultation

Post by the cheesecake man »

The current roundabout is unusual as it signs all right turns to use both lanes. Traffic lights aim to avoid having more than one right turn on the roundabout at once. It mostly works but inevitably still leads to traffic flows merging hence vehicles needing to cross over. If everyone's going slowly, has used the junction many times, is alert to this and signals then collisions can usually be avoided but it's still a cray situation to create. So clearly freeflow is needed.

There's certainly a place for widening existing roundabouts, adding left-turns cut-offs etc. But demolishing an overloaded roundabout just to build a slightly bigger one is totally bonkers. :rolleyes:

It is however refreshingly honest of NH to admit their proposals are pants as A and B clearly are. :thumbsup:
User avatar
jackal
Member
Posts: 7549
Joined: Tue Jan 08, 2008 23:33
Location: M6

Re: Lofthouse Junction Upgrade Consultation

Post by jackal »

I've had a go at a more 'realistic' upgrade of J43 and surrounds. The braiding I previously suggested for the M621 had to go due to cost, lack of space, and proximity to the estate to the west. Instead we have a short Q2 C/D lane section on the M621, similar to that on the M1 for J43-J44.

Remarkably the whole improvement down to Lofthouse requires only one new bridge. Admittedly it would take a lot of road - there are ten parallel carriageways at one point!

M1 J43 - Copy.jpg
User avatar
jackal
Member
Posts: 7549
Joined: Tue Jan 08, 2008 23:33
Location: M6

Re: Lofthouse Junction Upgrade Consultation

Post by jackal »

For option C they propose to widen the ECML bridge and an adjacent road bridge on the M1 southbound to accommodate the revised merge. They're in blue here:

M1 J41-J42 - Copy.PNG

The extra width merges in even though it's halfway to J41 at that point with the difficult bit widened. I'd suggest that they should take that through as a fifth lane to J41, allowing a double lane gain from Lofthouse. This is the only section of motorway at Lofthouse that doesn't have a double lane gain/drop, so clearly there are the turning volumes to warrant it. It's already five lanes northbound with double lane drop.

It may require replacement of a gantry and old (60s?) accommodation bridge here but that shouldn't be a show stopper.
User avatar
FleetlinePhil
Member
Posts: 2070
Joined: Fri Sep 08, 2017 11:26
Location: Calder Valley

Re: Lofthouse Junction Upgrade Consultation

Post by FleetlinePhil »

A bit of mainstream coverage on the BBC News webpage for Leeds & West Yorkshire yesterday, although no mention on their pages for adjoining parts of the region whose drivers may still use the junction.

It's probably overshadowed at the moment by the crisis at Yorkshire County Cricket Club, but it might lead to a few more people viewing the proposals.
User avatar
Chris5156
Deputy Treasurer
Posts: 16909
Joined: Thu Sep 06, 2001 21:50
Location: Hampshire
Contact:

Re: Lofthouse Junction Upgrade Consultation

Post by Chris5156 »

All the things I really want to say about this have already been covered upthread, but I can't let this pass by without adding a quick "+1", because it is a joy to see NH proposing (and seemingly throwing their weight behind) an upgrade to free-flow which is appropriate, cleverly designed and which will make a lasting improvement that will stand for decades. And, being from just up the road, I'm particularly delighted to see that it's happening at Lofthouse.

Let us pray that option C is taken forward. I've just filled in the consultation to make my views on that clear.
Peter Freeman
Member
Posts: 1391
Joined: Thu Aug 30, 2012 07:52
Location: Exits 9 & 10, M1 East, Melbourne, Australia

Re: Lofthouse Junction Upgrade Consultation

Post by Peter Freeman »

Chris5156 wrote: Sat Nov 06, 2021 00:59 All the things I really want to say about this have already been covered upthread, but I can't let this pass by without adding ...
... that as we see, with relief, the end of this one, we're building more.
User avatar
JammyDodge
Member
Posts: 485
Joined: Sat Oct 13, 2018 13:17

Re: Lofthouse Junction Upgrade Consultation

Post by JammyDodge »

Peter Freeman wrote: Sat Nov 06, 2021 03:59
Chris5156 wrote: Sat Nov 06, 2021 00:59 All the things I really want to say about this have already been covered upthread, but I can't let this pass by without adding ...
... that as we see, with relief, the end of this one, we're building more.
Blame the Treasury and its obsessiveness around CBA, which is almost always short sighted. It will almost always show a 3-level stack-about as the best C-B ratio for a new strategic route interchange.
Although it is to be noted, that we have seemingly learned to build them wider from the start now, as shown by Black Cat. (The M25/A3 proposals are a true atrocity of traffic engineering)
Designing Tomorrow, Around the Past
User avatar
jackal
Member
Posts: 7549
Joined: Tue Jan 08, 2008 23:33
Location: M6

Re: Lofthouse Junction Upgrade Consultation

Post by jackal »

JammyDodge wrote: Sun Nov 07, 2021 07:05
Peter Freeman wrote: Sat Nov 06, 2021 03:59
Chris5156 wrote: Sat Nov 06, 2021 00:59 All the things I really want to say about this have already been covered upthread, but I can't let this pass by without adding ...
... that as we see, with relief, the end of this one, we're building more.
Blame the Treasury and its obsessiveness around CBA, which is almost always short sighted. It will almost always show a 3-level stack-about as the best C-B ratio for a new strategic route interchange.
Although it is to be noted, that we have seemingly learned to build them wider from the start now, as shown by Black Cat.
Can't blame the treasury on that one. An option with freeflow for all major movements got only 27% support in public consultation because it was too "complex". 60% supported the stackabout. The myth of the big roundabout that solves everything is deeply embedded in the British psyche.
booshank
Member
Posts: 611
Joined: Thu Apr 28, 2011 19:05

Re: Lofthouse Junction Upgrade Consultation

Post by booshank »

jackal wrote: Sun Nov 07, 2021 08:24
JammyDodge wrote: Sun Nov 07, 2021 07:05
Peter Freeman wrote: Sat Nov 06, 2021 03:59

... that as we see, with relief, the end of this one, we're building more.
Blame the Treasury and its obsessiveness around CBA, which is almost always short sighted. It will almost always show a 3-level stack-about as the best C-B ratio for a new strategic route interchange.
Although it is to be noted, that we have seemingly learned to build them wider from the start now, as shown by Black Cat.
Can't blame the treasury on that one. An option with freeflow for all major movements got only 27% support in public consultation because it was too "complex". 60% supported the stackabout. The myth of the big roundabout that solves everything is deeply embedded in the British psyche.
But how much weight is given to public preference? This is a relatively technical subject where the public is not really to be expected to be able to have an informed opinion.