A358 Taunton to Southfields
Moderator: Site Management Team
Re: A358 Taunton to Southfields
Consultation open. The good news - they're getting rid of the Nexus 25 roundabout! The bad news - they're replacing it with a signalised crossroads
https://highwaysengland.citizenspace.co ... sultation/
https://highwaysengland.citizenspace.co ... sultation/
Re: A358 Taunton to Southfields
I will definitely be putting your idea for a bridge there instead in the consultation. That would make much more sense, then the old A358 can be used for the local traffic. The change to the local road network on the west side at the A378 junction is weird too, the "busiest" connection is to Ash Road, yet they have removed the direct link to the junction.jackal wrote: ↑Tue May 24, 2022 12:28 Consultation open. The good news - they're getting rid of the Nexus 25 roundabout! The bad news - they're replacing it with a signalised crossroads
https://highwaysengland.citizenspace.co ... sultation/
The consultation has a link to a map of expected traffic changes, they only expect a very small drop in traffic on the A303 west of Ilminster which is slightly surprising
Re: A358 Taunton to Southfields
I guess it's a positive that they're recognizing the roundabout should be replaced, they just need to take a step further.
Here's the bridge idea again for the new readers:
East-facing slips could also be considered.
Here's the bridge idea again for the new readers:
East-facing slips could also be considered.
Re: A358 Taunton to Southfields
That is not that surprising as most traffic is travelling Taunton to Yeovil, the flows west of Southfields are quite low, although DFT data has shown an increase up to 2019, but still only around 15,000 to 16,000 AADT.
The flows at the eastern end of the Ilminster bypass are circa 35,000, dropping again east of the A3088.
The A358 carries higher flows than the A303 west of Southfields.
What this all shows is that the busiest area is the the actual Ilminster bypass and with the A358 improved removing the throttle of the existing road, congestion and delays on the bypass will get worse. This needs to be dualled and a free flow provided from the A358 to A303 East.
And the crossroads before the M5, give me strength
The M25 - The road to nowhere
- JammyDodge
- Member
- Posts: 487
- Joined: Sat Oct 13, 2018 13:17
Re: A358 Taunton to Southfields
The only slip you would need to consider is this one, to remove traffic going all the way around the roundabout to access the old A358/Nexus25 Having an onlip would arguably be unnecessary, due to it being the 1st exit from the roundabout?
Designing Tomorrow, Around the Past
Re: A358 Taunton to Southfields
You are right, the case for the offslip is clearest. But the onslip might also be a good idea to stop Nexus 25 and P&R traffic going along the old A358 in preference to backtracking to J25. The same could perhaps be achieved with traffic calming on the old A358 or even prohibiting the right turn onto the old A358 here.
Re: A358 Taunton to Southfields
Oh how horrible is the word "signalised" is used by the highway authority....why doesnt the word "signalled" do?jackal wrote: ↑Tue May 24, 2022 12:28 Consultation open. The good news - they're getting rid of the Nexus 25 roundabout! The bad news - they're replacing it with a signalised crossroads
https://highwaysengland.citizenspace.co ... sultation/
And the roundabout only cost £19.2M. ...so after 18 months maybe time is right to announce its demise...
Re: A358 Taunton to Southfields
I was of the understanding that the A358 here was also forming the de facto dual carriageway high-quality link between the A303 and the M5, replacing the substandard section of A303/A30 southwest of Yeovil? That was why I was so baffled by the fact all the strategic traffic was forced through the roundabout serving a local development. Am I mistaken?
-
- Member
- Posts: 1409
- Joined: Thu Aug 30, 2012 07:52
- Location: Exits 9 & 10, M1 East, Melbourne, Australia
Re: A358 Taunton to Southfields
Because 'signalled' means something different: it's the past tense of the verb 'to signal'.
The adjective 'signalised' comes from the verb 'to signalise', which is formed in the standard way to mean 'conversion to, or addition of, signals'. It's the correct word and the correct usage.
I'm aware that we don't generally indulge in grammatical pedantry on Sabre, but this is an important word in our context, and it's worthwhile to get it right. The validity of the word has been discussed by us previously.
Re: A358 Taunton to Southfields
Exactly, it's unbelievably stupid. Building quite large grade separated junctions to access the bright lights of Ashill, while putting in a roundabout/traffic lights to access a thus-far entirely fictional business park is madness.DB617 wrote: ↑Tue May 24, 2022 23:31 I was of the understanding that the A358 here was also forming the de factodual carriagewayhigh-quality link between the A303 and the M5, replacing the substandard section of A303/A30 southwest of Yeovil? That was why I was so baffled by the fact all the strategic traffic was forced through the roundabout serving a local development. Am I mistaken?
I have filled in the consultation and made that point, and suggested they build a bridge instead of 9 lanes of traffic lights
Re: A358 Taunton to Southfields
Well they ruined the free flow M5 J29 which has got progressively worse with each so called improvement and addition of more signalsHerned wrote: ↑Wed May 25, 2022 09:24Exactly, it's unbelievably stupid. Building quite large grade separated junctions to access the bright lights of Ashill, while putting in a roundabout/traffic lights to access a thus-far entirely fictional business park is madness.DB617 wrote: ↑Tue May 24, 2022 23:31 I was of the understanding that the A358 here was also forming the de factodual carriagewayhigh-quality link between the A303 and the M5, replacing the substandard section of A303/A30 southwest of Yeovil? That was why I was so baffled by the fact all the strategic traffic was forced through the roundabout serving a local development. Am I mistaken?
I have filled in the consultation and made that point, and suggested they build a bridge instead of 9 lanes of traffic lights
The M25 - The road to nowhere
Re: A358 Taunton to Southfields
No you are not. The intention is most definitely to upgrade the A358 and use that as an alternative to trying to take on the environmental lobby in forcing a new road through the Blackdown Hills.DB617 wrote: ↑Tue May 24, 2022 23:31 I was of the understanding that the A358 here was also forming the de factodual carriagewayhigh-quality link between the A303 and the M5, replacing the substandard section of A303/A30 southwest of Yeovil? That was why I was so baffled by the fact all the strategic traffic was forced through the roundabout serving a local development. Am I mistaken?
But you also need to remember the Government is fixated on Development = automatically good ideology which trumps everything else. So...
the Government fails to object to the Nexus25 plans in the first place (which is simply dumping more private car focused development on the strategic road network)
fails to safeguard any route through the development that would allow a free flow connection to the M5 (can't have the Government reducing any of that 'development land' now can we)
falls over backward to help the developers access needs just so the DfT don't have to pay for 500yards of road.
It stinks - but when the political class are (1) in the pocket of developers and (2) want to do everything on the cheap so they can bleat on about low taxes then what else do you expect?
Re: A358 Taunton to Southfields
What a ridiculous junction. The fact that Exeter -> M5 South traffic has to make that ridiculous u-turn is just beyond belief.A303Chris wrote: ↑Wed May 25, 2022 13:45Well they ruined the free flow M5 J29 which has got progressively worse with each so called improvement and addition of more signalsHerned wrote: ↑Wed May 25, 2022 09:24Exactly, it's unbelievably stupid. Building quite large grade separated junctions to access the bright lights of Ashill, while putting in a roundabout/traffic lights to access a thus-far entirely fictional business park is madness.DB617 wrote: ↑Tue May 24, 2022 23:31 I was of the understanding that the A358 here was also forming the de factodual carriagewayhigh-quality link between the A303 and the M5, replacing the substandard section of A303/A30 southwest of Yeovil? That was why I was so baffled by the fact all the strategic traffic was forced through the roundabout serving a local development. Am I mistaken?
I have filled in the consultation and made that point, and suggested they build a bridge instead of 9 lanes of traffic lights
I also despise the A379/A3015 GSJ. In its original form, it may have made sense, but when I reached the end of what has to be one of the most expansive non-primary junctions I've ever traversed, I was absolutely amazed to hit two complex signalised junctions.
Re: A358 Taunton to Southfields
My hopes aren't much more than floor-high, but I've filled in the consultation all the same.
Chris
Roads.org.uk
Roads.org.uk
Re: A358 Taunton to Southfields
Are you suggesting ripping up the GSJ and replacing it with a flat junction then, at taxpayers' expense, for no benefit?
It still works just fine, so I'd say leave it. The fact that there's signalised junctions on the road between there and the M5 might be a little Sabristically displeasing, but it's perfectly understandable. I've never seen that road congested.
(Heck, I'll make the same argument about M5 J29 - yes, it's a big mess, but it works, and doesn't get congested - the main things I don't like about it in practice are 1) the very faded lane markings when performing the E->S movement and 2) the silly lane arrangement that makes everyone have to move a lane to the left when travelling E on the A30. But this one could at least benefit from some freeflow.)
Re: A358 Taunton to Southfields
The point is that it did have freeflow, which was removed for no sensible reason whatever. Even if it is never 'congested' it is still operating worse than it would do with the freeflow there, because the 'uncongested' traffic is waiting in the blessed stacking space when it should just be driving to its destination without stopping, like it used to be able to. (This mostly applies to A30wb to M5sb, which was previously freeflow, but in a more qualified form for M5nb to A30eb, which used to have one set of lights to traverse and now has three.)Keiji wrote: ↑Fri May 27, 2022 06:16 (Heck, I'll make the same argument about M5 J29 - yes, it's a big mess, but it works, and doesn't get congested - the main things I don't like about it in practice are 1) the very faded lane markings when performing the E->S movement and 2) the silly lane arrangement that makes everyone have to move a lane to the left when travelling E on the A30. But this one could at least benefit from some freeflow.)
Many of the failures of junction design in this country are down to the concept that 'no congestion' and 'within capacity' can be achieved by making traffic wait for arbitrarily long periods, provided they have a nice wide bit of road to wait in. By this logic a sufficiently large car park is a higher capacity junction than a four-level stack. See the wonderful results of this in the new designs for M6 J10, M6 J11, Wisley, A358/Nexus 25, and many others. In more enlightened jurisdictions (and occasionally when there is an outbreak of commonsense in the UK) congestion is defined as any departure from freeflowing conditions, i.e., any reduction below 50mph, or whatever the target speed is. By this improved definition any signalized junction is inherently congested. That's not of course to say that they should never be built - far from it - but just that delays should actually be recognized as such and included in the modelling, rather than swept under the carpet.
Last edited by jackal on Fri May 27, 2022 10:37, edited 1 time in total.
Re: A358 Taunton to Southfields
Well, I subsequently did my reading and discovered that it was originally part of the Exeter bypass, hence the huge size and more recent reduction from free flowing to end-signalled. If it had been built with end signals it really would have been a dreadful waste of money, but no, I cannot say I would like to see old GSJs removed and signalised.Keiji wrote: ↑Fri May 27, 2022 06:16Are you suggesting ripping up the GSJ and replacing it with a flat junction then, at taxpayers' expense, for no benefit?
It still works just fine, so I'd say leave it. The fact that there's signalised junctions on the road between there and the M5 might be a little Sabristically displeasing, but it's perfectly understandable. I've never seen that road congested.
(Heck, I'll make the same argument about M5 J29 - yes, it's a big mess, but it works, and doesn't get congested - the main things I don't like about it in practice are 1) the very faded lane markings when performing the E->S movement and 2) the silly lane arrangement that makes everyone have to move a lane to the left when travelling E on the A30. But this one could at least benefit from some freeflow.)
Re: A358 Taunton to Southfields
jackal wrote: ↑Fri May 27, 2022 10:13Many of the failures of junction design in this country are down to the concept that 'no congestion' and 'within capacity' can be achieved by making traffic wait for arbitrarily long periods, provided they have a nice wide bit of road to wait in. By this logic a sufficiently large car park is a higher capacity junction than a four-level stack. See the wonderful results of this in the new designs for M6 J10, M6 J11, Wisley, A358/Nexus 25, and many others. In more enlightened jurisdictions (and occasionally when there is an outbreak of commonsense in the UK) congestion is defined as any departure from freeflowing conditions, i.e., any reduction below 50mph, or whatever the target speed is. By this improved definition any signalized junction is inherently congested. That's not of course to say that they should never be built - far from it - but just that delays should actually be recognized as such and included in the modelling, rather than swept under the carpet.
Chris
Roads.org.uk
Roads.org.uk
Re: A358 Taunton to Southfields
Yes, a bridge with east facing slips for Nexus. Developers really are in charge these days, same with new housing sprawling out of most towns nowadays, messing up bypasses.
Here is M5 J29 as it was from 1975 to... 2010? The original S2 becoming D2 under the M5 and freeflow for all. Even when the D2 was opened in Aug 99, it was freeflow for a while. Note the fields beyond the M5, now all built on, with many more signalled junctions along the way.
Here is M5 J29 as it was from 1975 to... 2010? The original S2 becoming D2 under the M5 and freeflow for all. Even when the D2 was opened in Aug 99, it was freeflow for a while. Note the fields beyond the M5, now all built on, with many more signalled junctions along the way.
Roads and holidays in the west, before motorways.
http://trektothewest.shutterfly.com
http://holidayroads.webs.com/
http://trektothewest.shutterfly.com
http://holidayroads.webs.com/
Re: A358 Taunton to Southfields
I would not say developers, they are tied by the rules local planning authorities and highway authorities make. They are so desperate to make there housing allocations and pushing active travel they fall for viability issues every time. Often a developer will have priced for a better junction, but pull the viability argument and can get the proposals watered down.SteveA30 wrote: ↑Fri May 27, 2022 11:00 Yes, a bridge with east facing slips for Nexus. Developers really are in charge these days, same with new housing sprawling out of most towns nowadays, messing up bypasses.
Here is M5 J29 as it was from 1975 to... 2010? The original S2 becoming D2 under the M5 and freeflow for all. Even when the D2 was opened in Aug 99, it was freeflow for a while. Note the fields beyond the M5, now all built on, with many more signalled junctions along the way.
All goes down to the lack of experience within the local authorities and the lack of professionally qualified staff.
The M25 - The road to nowhere