A17 Sutton Bridge (Crosskeys Bridge Repainting)
Moderator: Site Management Team
Re: A17 Sutton Bridge (Crosskeys Bridge Repainting)
Thank you for the update Skiddaw05 as I’ll be passing through that way next week.
Re: A17 Sutton Bridge (Crosskeys Bridge Repainting)
The traffic management was removed at 1130 today, Friday 1 July, just in time for a wet weekend...
Sent from my SM-G973F using Tapatalk
Sent from my SM-G973F using Tapatalk
Re: A17 Sutton Bridge (Crosskeys Bridge Repainting)
https://lincolnshire.moderngov.co.uk/do ... s%20an.pdf
Looks like they plan to swap out the hydraulics for electric motors.
Going to cost £1.7m which includes £0.5m which was going to be spent on renewing the existing hydraulic and PLC systems.
Looks like they plan to swap out the hydraulics for electric motors.
Going to cost £1.7m which includes £0.5m which was going to be spent on renewing the existing hydraulic and PLC systems.