Gallery:A14/Huntingdon to Cambridge Improvement

From Roader's Digest: The SABRE Wiki
Jump to navigation Jump to search
Road Projects > A14/Huntingdon to Cambridge Improvement


 
This gallery has no child categories
A14/Huntingdon to Cambridge Improvement
 
Galleries with a large number of pictures split across multiple pages are currently not working correctly - to see all images in the gallery click here.
 
A14 road improvements - Geograph - 5392415.jpg
A14 road improvements Concrete pier construction next to the A1 Grafham slip road.
20171202-1153 - View of the works from Alconbury South Interchange - 52.361855N 0.244892W.jpg
View of the works from the Alconbury South Interchange overbridge
20171202-1217 - East Coast Main Line Bridge from B1043 - 52.295252N 0.208092W.jpg
A14 East Coast Main Line Bridge from B1043
20171202-1236 - Bridge construction on Hilton Road.jpg
A14 Bridge construction and road realignment on Hilton - Fenstanton Road
20171202-1245 - Bridge construction on Conington Road 52.2885689N 0.071782W.jpg
A14 Bridge construction and realignment of Conington Road
20171202-1247 - line of A14 west from Conington Road 52.2885689N 0.071782W.jpg
Line of A14 west from Conington Road
A14 road improvements - Geograph - 5392390.jpg
A14 road improvements A14 construction area and A1 northbound side by side. Look out for traffic upheaval in the next four years.
A14 road improvements - Geograph - 5392411.jpg
A14 road improvements Concrete beam assembly area beside the Grafham Brampton road.
A14 road improvements - Geograph - 5392428.jpg
A14 road improvements Concrete beam assembly area complete with a Sarens crawler crane for handling the larger beams.
A14 road improvements - Geograph - 5392403.jpg
A14 road improvements Southbound A1 and the first concrete piers of a flyover for the A14 link road. The Brampton construction site compound is in the distance.
A14 road improvements - Geograph - 5392441.jpg
A14 road improvements Working on the Brampton side of the A1.
A14 road improvements - Geograph - 5392341.jpg
A14 road improvements The construction area around the East Coast Main Line and the River Ouse near Offord.
A14 road improvements - Geograph - 5392329.jpg
A14 road improvements Construction traffic crossing point on the Offord road, B1043.
A14 road improvements - Geograph - 5392333.jpg
A14 road improvements Looking east of the B1043. A temporary access road appears to have been constructed.
New A14 construction - Section 3 Logistics Yard - Geograph - 5678724.jpg
New A14 construction - Section 3 Logistics Yard Viewed from a new roundabout on the A1198.
A14 road improvements - Geograph - 5392299.jpg
A14 road improvements North Westerly view of the carriageway line towards the Hilton to St Ives road.
A14 road improvements - Geograph - 5392099.jpg
A14 road improvements A line up of plant equipment being used in the construction of the new route around Huntingdon for the A14
A14 road improvements - Geograph - 5392307.jpg
A14 road improvements Not such good news, the cones are already in place! The carriage way working area to the South West of the Hilton road.
A14 improvements- bridge under construction at Friesland Farm - Geograph - 5538435.jpg
A14 improvements- bridge under construction at Friesland Farm
Bridge building on the A14 - Geograph - 5683197.jpg
Bridge building on the A14 A new bridge under construction at the Swavesey Junction that gives access to the Cambridge Services and Buckingway Business Park.
A428 and road-building works - Geograph - 5343230.jpg
A428 and road-building works On the left is part of the building site for the changes to Girton Interchange as part of upgrade works to the A14. The piling rig is installing piles to support a new flyover. The speck in the sky is a helicopter.
Road Works at Bar Hill - Geograph - 5680042.jpg
Road Works at Bar Hill Excavator and crane/pile driver by the A14 - part of the extensive works to rebuild and expand the road.
20180602-1644 - A14 works - Ermine St Jct N Rbt heading South on A1198 52.293362N 0.149647W.jpg
A14 works - Ermine St Jct N Rbt heading South on A1198
20180602-1646 - A14 works - Ermine St Jct looking East 52.29222N 0.148177W.jpg
A14 works - Ermine St Jct looking East
20180602-1647 - A14 works - Ermine St Jct from wb emergency slip 52.292371N 0.148306W.jpg
A14 works - Ermine St Jct from wb emergency slip
20180602-1647 - A14 works - Ermine St Jct looking East 52.292371N 0.148306W.jpg
A14 works - Ermine St Jct looking East
20180602-1647 - A14 works - Ermine St Jct overbridge looking west 52.292371N 0.148306W.jpg
A14 works - Ermine St Jct overbridge looking west
20180602-1648 - A14 works looking East from Ermine St Junction 52.292581N 0.147662W.jpg
A14 works looking East from Ermine St Junction
20180602-1648 - A14 works looking West at Ermine St Junction 52.292581N 0.147662W.jpg
A14 works looking West at Ermine St Junction
20180602-1650 - A1198 overbridge at Ermine St Junction 52.292397N 0.148649W.jpg
A1198 overbridge at Ermine St Junction
20180602-1651 - Looking East A1198 overbridge Ermine St Jct 52.292568N 0.150312W.jpg
Looking East A1198 overbridge Ermine St Jct
20180602-1652 - Looking East A1198 overbridge Ermine St Jct 52.292574N 0.152232W.jpg
Looking East A1198 overbridge Ermine St Jct
20180602-1657 - A1198 Ermine St Jct Overbridge 52.292673N 0.148917W.jpg
A1198 Ermine St Jct Overbridge
20180602-1706 - B1040 heading north towards the A14 works - embankment for new bridge ahead 52.2875475N 0.105878W - cropped.jpg
B1040 heading north towards the A14 works - embankment for new bridge ahead. This straightens the road and allows it to pass over the A14.
20180602-1713 - A14 New Swavesey Junction overbridge 52.2765052N 0.0198272W.jpg
A14 Swavesey Junction overbridge
20180602-1715 - Farm Access A14 Southbound 52.266869N 0.0020698E- cropped.jpg
Farm Access A14 Southbound
20180602-1719 - Temporary Overbridge north of Girton, A14 heading south - 52.2444132N 0.0505813E.jpg
Temporary Overbridge north of Girton
20180602-1134 - A14 new free flow sliproad over A428 52.2305N 0.066416E - cropped.jpg
A14 new free flow sliproad over A428
20180714-1137 - New accommodation bridge at Brampton Hut Interchange, to carry new A14 mainline 52.330385N 0.250852W.jpg
New accommodation bridge at Brampton Hut Interchange, to carry new A14 mainline
20180714-1202 - A14 bridge over ECML from B1043 52.294559N 0.209567W.jpg
A14 bridge over ECML from B1043
20180714-1204 - New B1043 overbridge across A14 Huntingdon to Cambridge road - cropped.jpg
New B1043 overbridge across A14 Huntingdon to Cambridge road
20180714-1225 - C167 approaching the new A1-A14 overbridge looking East 52.313335N 0.249715W.jpg
C167 approaching the new A1-A14 overbridge looking East
20180714-1226 - C167 overbridge, crossing the new A14 and A1 52.313519N 0.248406W.jpg
C167 overbridge, crossing the new A14 and A1
20180714-1228 - Old closed C167 from the new bridge 52.313401N 0.245938W.jpg
Old closed C167 from the new bridge
20180714-1229 - Old closed C167-A1 junction 52.313571N 0.245402W.jpg
Old closed C167-A1 junction
20180714-1230 - New A1 carriageways looking north from C167 overbridge 52.313807N 0.244522W.jpg
New A1 carriageways looking north from C167 overbridge
20180714-1231 - Old and new A1 carriageways looking north from the C167 overbridge 52.314162N 0.243621W.jpg
Old and new A1 carriageways looking north from the C167 overbridge
20180714-1231 - C167 heading towards Brampton 52.314332N 0.242741W.jpg
C167 heading towards Brampton

 
 
Page 1, 48 file(s) of 67 shown
Page 1 2
Gallery of A14/Huntingdon to Cambridge Improvement related videos
 
   
Swavesey Bridge Deck Installation