Following the rapid replacement of the carriageway following the flash-flood in Coverack in July 2017, there remained remedial works requiring these temporary traffic lights.
Picture taken a couple of weeks after the disastrous Coverack flooding of 18 July 2017. The road opened six days after the surface was destroyed and huge holes made in it by boulders being swept down the hill. Remedial works continued behind the camera including single-line working.