Brasley Bridge- the new widened deck Work has been going on since spring 2015. Concrete was being pumped on to welded mesh to form the deck.
Grantchester Road closed The road from Trumpington to Grantchester will be closed to all but cyclists and pedestrians until August 2015 while Brasley Bridge is rebuilt.
High Street, Grantchester Near the Green Man public house.
A temporary sign showing the C201. Pretty self explanitory really.