The construction of an additional (southbound) lane from Sandyknowes to Greencastle and the closure of the northbound inside lane is having an effect on peak traffic flow. This queue is appx 2� miles long. Taken at 16.35 before the real peak flow had started. 28 September 2007. (This is a daily event M-F).
Originally uploaded to Coppermine on Nov 12, 2007 by Wee Hughie
M2 SB approaching the foreshore
A2/M2/M5 interchange
Originally uploaded to Coppermine on Aug 07, 2007 by csd