Looking south from the temporary bridge at Grosvenor Road just a few hours after the underpass was opened to traffic for the first time on 2 Sep 2007. You can still see the temporary road layout on each side of the underpass, which was in use until the day before.
Originally uploaded to Coppermine on Sep 02, 2007 by nirs
Grosvenor Road junction, Westlink
Work is advancing well on the future underpass at Grosvenor Road, here looking north (towards M2). All traffic is currently driving on each side of the road. This will be a limited-access junction with sliproads only in the south-facing direction. Taken from the temporary flyover. Note the nice edging being added to the flyover.
Originally uploaded to Coppermine on Jul 08, 2007 by nirs