Hunter Bridge at Kelso This 13-span pre-stressed concrete bridge carrying the A698 road over the River Tweed was built between 1997 and 1998 to reduce the congestion on the 1804 John Rennie bridge and direct traffic around the edge of the town. It was designed by Blyth and Blyth and the contractor was Miller Civil Engineering.