Gallery:Speed limit sign/60 km/h
Originally uploaded to Coppermine on May 19, 2007 by murphaph
This dumbbell was replaced by two signalised crossroads in 2009 -- C2r
Southbound. 60km/h? Some mistake, surely. This section is finished.
Originally uploaded to Coppermine on Jun 15, 2007 by mackerskiFirst of the remaining two roundabouts when heading east on the Cork Southern Ring Road.
Originally uploaded to Coppermine on Dec 08, 2007 by csdCentral reservation now cleared.
Originally uploaded to Coppermine on Jan 06, 2007 by csdNorthbound. Note restricted clearance under the original WS2 bridge.
Originally uploaded to Coppermine on Oct 12, 2009 by csdNorthbound, the gantry for the new intermediate junction has been installed. Taken 11.10.2009.
Originally uploaded to Coppermine on Oct 12, 2009 by csdNorthern end, start of the divided section near the tie-in with the unimproved N7 road.
Originally uploaded to Coppermine on Oct 12, 2009 by csdThis is taken at the top of the NB slip off the M50 at J7. To the right will eventually lead to the N4 eastbound. To the left is N4 westbound.
Originally uploaded to Coppermine on Jul 03, 2007 by csdNote the very odd black-on-white direction signage for J10. This anomoly has been here since the motorway opened in 1990 -- hopefully it'll be replaced as part of the upgrade. Speed limit through the works is 60 km/h. This is way too low, and is universally ignored (when traffic is light enough!). In Germany it'd be an 80 km/h limit.
Originally uploaded to Coppermine on Sep 02, 2006 by csdA speed indicator display, measured in km/h, as seen on the Howth Road in Raheny, northern Dublin.
Originally uploaded to Coppermine on Jun 05, 2007 by DorsetWayVienna's eastern ring road is apparently currently under construction - and you can see why it's needed.
Originally uploaded to Coppermine on Aug 01, 2005 by IJP1Diverge point for northbound off-slip, taken 30.03.2008.
Originally uploaded to Coppermine on Mar 30, 2008 by csd