M60 Simister Island June 2020 Consultation Option 2
Description:
We are holding a consultation on our plans to improve Simister Island Interchange at junction 18 of the M60. This is the Inner Links option, which is the second of the two options we have developed. This would involve building two new bridges over the M66 within the roundabout. We’d also build a new free-flow link from the M60 eastbound to the M66 northbound, and replace the existing single-lane from the M60 northbound to westbound with two lanes. We’d need to widen the M60 eastbound and M66 southbound slip roads if we select this option, as well as widening Hills Lane bridge just north of the project.