Proposal to extend to Lissenhall (J4) and junction redesign there.This should be of some good benefit to commuters but the M1 really needs to be widened far further out - as far as North of Balbriggan IMO
I guess, the N32 got two lanes to allow potential queueing, it widens to 3 lanes at the traffic light controlled roundabout, which was the old junction.Trebeck wrote: I'm surprised that M50 -> M1 Northbound has 1 lane, yet the N32 to Malahide (which effectively is now the only destination that this lane drop will use as the others are free flow) has 2. Surely M50 -> M1 Northbound would be a priority? (Along with Port Tunnel / N1 City Centre).
I would have mapped the lanes 2 - 2 - 1. Was Malahide given 2 lanes to prevent HGVs from having to use the rightmost lane?
odlum wrote:Details of proposed interchange upgrade on the N3 at Mulhuddart just outside the M50
http://www.fingalcoco.ie/Files/Roads/09016200.pdf
Comhairle Contae Fhine Gall
Fingal County Council
Planning and Development Acts 2000 – 2006
Part VIII Planning and Development Regulations 2001 – 2006
N3 Mulhuddart Interchange Upgrade
Pursuant to the requirements of the above, notice is hereby given of the proposed construction by Fingal County Council of the above Scheme.
The proposed works comprise:-
Construction of a new 2-span bridge on the western side of the existing road bridge together with footpath and on-road cycle lane.
Modify existing bridge to one-way traffic flow southbound. Remove existing footpath on western side of bridge to provide for right turning movements and provision of on road cycle lane on eastern side of bridge.
Construction of 260m of 4m wide looped on ramp to the N3 eastbound from the new bridge.
Widening of the Blanchardstown Road North, Blanchardstown Road South and Old Navan Road on approach to the interchange, and widening of the N3 westbound on/off ramps.
Extension of existing bus lanes on Blanchardstown Road North and Blanchardstown Road South to the proposed signalised junction.
Provision of on-road cycle lane together with pedestrian footpath and grass verge on both sides of the Old Navan Road, Blanchardstown Road North and Blanchardstown Road South.
Relocation of the N3 off-ramp from Navan/Cavan to the Old Navan Road approximately 48m northwest of existing T-junction. The new junction to be signalised.
Relocation of the on-ramp from the Old Navan Road to the N3 approximately 150m southeast of existing junction.
Replace existing interchange roundabouts with signalised junctions incorporating advanced signaling for buses.
Provision of all watermains, sewers, drainage and utility infrastructure, public lighting, signage, road lining and landscaping associated with the above works.
Plans and particulars of the proposed development as shown on the Public Display Drawings are available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy thereof from Thursday 10th March, 2011 to Tuesday 3rd May,2011 as follows:
Fingal County Council, Monday – Friday 9.30a.m. – 4.30 p.m.
Grove Road, (open through lunch)
Blanchardstown,
Dublin 15.