Potential upgrade A46 Stoneleigh Junction

The study of British and Irish roads - their construction, numbering, history, mapping, past and future official roads proposals and general roads musings.

There is a separate forum for Street Furniture (traffic lights, street lights, road signs etc).

Registered users get access to other forums including discussions about other forms of transport, driving, fantasy roads and wishlists, and roads quizzes.

Moderator: Site Management Team

User avatar
Alderpoint
Member
Posts: 1686
Joined: Wed Aug 19, 2015 14:25
Location: Leamington Spa

Re: Potential upgrade A46 Stoneleigh Junction

Post by Alderpoint »

Reading between the lines this might finally be open by Q1 2025.

https://kenilworth.nub.news/news/local- ... ete-226923
Let it snow.
darkcape
Member
Posts: 2098
Joined: Wed Aug 29, 2012 14:54

Re: Potential upgrade A46 Stoneleigh Junction

Post by darkcape »

What am I missing here, how has it taken so long??
Did you know there's more to SABRE than just the Forums?
Add your roads knowledge to the SABRE Wiki today!
Have you browsed SABRE Maps recently? Try getting involved!
User avatar
M4 Cardiff
Member
Posts: 2404
Joined: Mon Sep 20, 2004 15:12
Location: Leamington Spa

Re: Potential upgrade A46 Stoneleigh Junction

Post by M4 Cardiff »

They are claiming that they are having problems with obtaining suitable material to construct the backfill behind the bridge abutments. This seems a strange excuse as under SHW600, there are actually a wide variety of materials that can be used, and even if they need Type1 or 6F2, its not particularly hard to get hold of.

I guess it is possible that the design requires reinforced earth, and there is a supply issue with the reqired grade of geogrid, however IMO the whole explanation seems like a fishy 'excuse' for a project management failure.
Driving thrombosis caused this accident......a clot behind the wheel.
User avatar
SouthWest Philip
Member
Posts: 3483
Joined: Sun Mar 31, 2002 19:35
Location: Evesham, Worcestershire

Re: Potential upgrade A46 Stoneleigh Junction

Post by SouthWest Philip »

M4 Cardiff wrote: Wed Apr 17, 2024 10:17 They are claiming that they are having problems with obtaining suitable material to construct the backfill behind the bridge abutments. This seems a strange excuse as under SHW600, there are actually a wide variety of materials that can be used, and even if they need Type1 or 6F2, its not particularly hard to get hold of.

I guess it is possible that the design requires reinforced earth, and there is a supply issue with the reqired grade of geogrid, however IMO the whole explanation seems like a fishy 'excuse' for a project management failure.
If only there were a major infrastructure project near by that could provide a ready supply of excavated material that could be used...
User avatar
Bryn666
Elected Committee Member
Posts: 35965
Joined: Thu Jun 20, 2002 20:54
Contact:

Re: Potential upgrade A46 Stoneleigh Junction

Post by Bryn666 »

SouthWest Philip wrote: Wed Apr 17, 2024 10:21
M4 Cardiff wrote: Wed Apr 17, 2024 10:17 They are claiming that they are having problems with obtaining suitable material to construct the backfill behind the bridge abutments. This seems a strange excuse as under SHW600, there are actually a wide variety of materials that can be used, and even if they need Type1 or 6F2, its not particularly hard to get hold of.

I guess it is possible that the design requires reinforced earth, and there is a supply issue with the reqired grade of geogrid, however IMO the whole explanation seems like a fishy 'excuse' for a project management failure.
If only there were a major infrastructure project near by that could provide a ready supply of excavated material that could be used...
"Sir, six cinder blocks are missing from our inventory."
"Then there'll be no hospital. I'll tell the children".
Bryn
Terminally cynical, unimpressed, and nearly Middle Age already.
She said life was like a motorway; dull, grey, and long.

Blog - https://showmeasign.online/
X - https://twitter.com/ShowMeASignBryn
YouTube - https://www.youtube.com/@BrynBuck
User avatar
wrinkly
Member
Posts: 9023
Joined: Tue Mar 04, 2008 12:17
Location: Leeds

Re: Potential upgrade A46 Stoneleigh Junction

Post by wrinkly »

Presumably the local market is overheated with HS2 work?