This is the potential white elephant that we could end up with - a SW facing A358 improvement at Taunton catering little for the regional flow of Yeovil to Bristol which still congests Henlade and M5J25 while the strategic SW A303 flow remains on the existing A303 and ignores the new scheme.A303Chris wrote:..I have to say that if the rest of the A303 is dualed and this upgrade to the A30 is undertaken, I will still go via the Blackdowns Hills as going via Taunton would add 10 miles to the journey and in my opinion total journey time would be the same
A358 Taunton to Southfields
Moderator: Site Management Team
- RichardA35
- Elected Committee Member
- Posts: 5722
- Joined: Thu Jul 11, 2002 18:58
- Location: Dorset
Re: A358 Taunton to Southfields
Re: A358 Taunton to Southfields
This is exactly why the Orange option is by HE's own metric (BCR of 1.6) the worst option, and why there was such an outcry from the public and local government. A scheme that still leaves 25,000 vehicles per day going through a village is obviously missing the point
- RichardA35
- Elected Committee Member
- Posts: 5722
- Joined: Thu Jul 11, 2002 18:58
- Location: Dorset
Re: A358 Taunton to Southfields
Yes but in absolute budget terms it is cheapest so has a good chance of being favoured.Herned wrote:This is exactly why the Orange option is by HE's own metric (BCR of 1.6) the worst option, and why there was such an outcry from the public and local government. A scheme that still leaves 25,000 vehicles per day going through a village is obviously missing the point
Re: A358 Taunton to Southfields
True, but I think politics will come in to this as well - Taunton is currently held by the Conservatives but has swung backwards and forwards, a more expensive but more popular road scheme under construction during the next scheduled general election could be seen as a good thing (see the history of the Croxley Rail Link for a similar situation)
Re: A358 Taunton to Southfields
The report on the original consultation is here:
https://highwaysengland.citizenspace.co ... uthfields/
The 'headline' finding, which perhaps explains the rerun consultation:
https://highwaysengland.citizenspace.co ... uthfields/
The 'headline' finding, which perhaps explains the rerun consultation:
When asked in the consultation questionnaire, ‘to what degree do you believe the scheme proposal has achieved the objectives?’ 53% of respondents either disagreed or strongly disagreed that the proposals would meet the scheme objectives
Re: A358 Taunton to Southfields
What's the latest on thus scheme. Where are we at now?
Went that way today. Thought at the time, they should keep it simple, online dualling with a bypass for Henlade. Improved access to the M5 . Which I know is basically what is proposed, but they seem to be over complicating it with all the different options, when most of us know what it needs.
Went that way today. Thought at the time, they should keep it simple, online dualling with a bypass for Henlade. Improved access to the M5 . Which I know is basically what is proposed, but they seem to be over complicating it with all the different options, when most of us know what it needs.
My latest Road Photos https://flic.kr/s/aHsktQHcMB
Re: A358 Taunton to Southfields
Analysis of consultation and further technical work. Preferred route due in late 2018.Richardf wrote:What's the latest on thus scheme. Where are we at now?
Re: A358 Taunton to Southfields
Thanks, was wondering as things had gone quiet recently.jackal wrote:Analysis of consultation and further technical work. Preferred route due in late 2018.Richardf wrote:What's the latest on thus scheme. Where are we at now?
My latest Road Photos https://flic.kr/s/aHsktQHcMB
Re: A358 Taunton to Southfields
Decision on the final route will not be made until Spring next year with another round of community consultation in January.
HE press release here.
While the road needs to be dualled, if the rest of the A303 is dualled, when I go to Cornwall that way, I wouldn't go up to Taunton and down the M5, but stay on the A303/A30.
Going via Taunton is 13 miles longer and negates some of the distanced saved from using the M4/M5.
The A303 /A30 through the Blackdown Hills is only 13 miles of single carriageway in a otherwise fully dualled route. Traffic Flows are very low apart from the Christmas / Easter / 8 weekends in the summer, so time wise the A303 still will be quicker
HE press release here.
While the road needs to be dualled, if the rest of the A303 is dualled, when I go to Cornwall that way, I wouldn't go up to Taunton and down the M5, but stay on the A303/A30.
Going via Taunton is 13 miles longer and negates some of the distanced saved from using the M4/M5.
The A303 /A30 through the Blackdown Hills is only 13 miles of single carriageway in a otherwise fully dualled route. Traffic Flows are very low apart from the Christmas / Easter / 8 weekends in the summer, so time wise the A303 still will be quicker
The M25 - The road to nowhere
Re: A358 Taunton to Southfields
I assume this means that the consultation is emphatically against HE's favoured route, and some further spin/tinkering is needed to try and get their preference agreed
Re: A358 Taunton to Southfields
I take it the "final route" refers to the route of the new D2 link road between the existing A358 and a new junction on the M5, rather than the dualling of the section south east of Ash Cross. Would the decision now be to determine whether the link road should bypass Henlade to the south or to the north?A303Chris wrote: ↑Thu Dec 06, 2018 09:38 Decision on the final route will not be made until Spring next year with another round of community consultation in January.
HE press release here.
E-roads, M-roads, A-roads, N-roads, B-roads, R-roads, C-roads, L-roads, U-roads, footpaths
Re: A358 Taunton to Southfields
The original HE preference was for a route connecting to a new roundabout junction on the M5 south of the existing J25. Which was no-one else's preference, it had a worse cost:benefit than two other options. The community and local councils want a route that connects directly to J25, as well as a link to the southbound M5... as without that Henlade will still experience significant traffic.Euan wrote: ↑Fri Dec 07, 2018 21:12 I take it the "final route" refers to the route of the new D2 link road between the existing A358 and a new junction on the M5, rather than the dualling of the section south east of Ash Cross. Would the decision now be to determine whether the link road should bypass Henlade to the south or to the north?
Re: A358 Taunton to Southfields
The PRA is due in "Spring 2019", and today is the last day of spring, according to HE (http://assets.highwaysengland.co.uk/roa ... y+2019.pdf)...
Re: A358 Taunton to Southfields
Preferred route announced. Brochure https://highwaysengland.citizenspace.co ... .06.19.pdf.
Abysmal, free flow onto M5 south not going ahead, so the scheme crashes into a new roundabout, before reaching the existing roundabout at J25. Unbelievable
Abysmal, free flow onto M5 south not going ahead, so the scheme crashes into a new roundabout, before reaching the existing roundabout at J25. Unbelievable
Re: A358 Taunton to Southfields
Abysmal is the word! The brochure has no junction layouts but seems to suggest the Southfields roundabout will also be retained, without free-flow onto the A303. Not much of a display of ambition for the A303 expressway project.Herned wrote: ↑Thu Jun 27, 2019 11:29 Preferred route announced. Brochure https://highwaysengland.citizenspace.co ... .06.19.pdf.
Abysmal, free flow onto M5 south not going ahead, so the scheme crashes into a new roundabout, before reaching the existing roundabout at J25. Unbelievable
Chris
Roads.org.uk
Roads.org.uk
- roadtester
- Member
- Posts: 31544
- Joined: Mon Mar 26, 2007 18:05
- Location: Cambridgeshire
Re: A358 Taunton to Southfields
Also, do we know the junction in the middle at Ash will be a GSJ?Chris5156 wrote: ↑Thu Jun 27, 2019 16:59Abysmal is the word! The brochure has no junction layouts but seems to suggest the Southfields roundabout will also be retained, without free-flow onto the A303. Not much of a display of ambition for the A303 expressway project.Herned wrote: ↑Thu Jun 27, 2019 11:29 Preferred route announced. Brochure https://highwaysengland.citizenspace.co ... .06.19.pdf.
Abysmal, free flow onto M5 south not going ahead, so the scheme crashes into a new roundabout, before reaching the existing roundabout at J25. Unbelievable
I agree this looks more like a "let's solve an immediate local problem" solution, rather than "this is the fix that solves the dualling the A303 corridor" problem.
Electrophorus Electricus
Check out #davidsdailycar on Mastodon
Check out #davidsdailycar on Mastodon
Re: A358 Taunton to Southfields
The roundabout at Southfields was always staying, changes there were ruled out previously, presumably moved to the Ilminster Bypass dualling scheme of 2064
I hadn't even thought of that! I take it to mean is they have decided not to have one or other, or maybe even none, of the intermediate junctions south of the A378. But given the rest of the shambles who knowsroadtester wrote: ↑Thu Jun 27, 2019 17:04 Also, do we know the junction in the middle at Ash will be a GSJ?
Re: A358 Taunton to Southfields
I can see similarities here with the A9 at Dunkeld (strategic long distance route vs local needs). It seems that HE's original plan was to give priority to the former with the orange route leaving the current alignment further south and linking directly to the M5 via a new junction rather than heading north first. This would however have effectively left Henlade unbypassed for a significant amount of traffic which is was never going to be popular with the locals and forced a rethink and today's announcement is the result. Just like it seems a roundabout at Dunkeld is almost certain now even though the GSJ would of course be much better for the strategic long distance traffic.roadtester wrote: ↑Thu Jun 27, 2019 17:04 I agree this looks more like a "let's solve an immediate local problem" solution, rather than "this is the fix that solves the dualling the A303 corridor" problem.
Re: A358 Taunton to Southfields
Maybe this is the time to slam in objections for the examination hearing. Projects that seek the worst option when it still has a low BCR do not deserve funding.