Flintshire Bridge
Jump to navigation
Jump to search
Flintshire Bridge | |||||||
Location Map ( geo) | |||||||
Flintshire Bridge from Dock Road Connors Quay | |||||||
| |||||||
From: | Flint | ||||||
To: | Deeside Industrial Park | ||||||
Location | |||||||
Flint | |||||||
County | |||||||
Flintshire | |||||||
Highway Authority | |||||||
Flintshire | |||||||
Opening Date | |||||||
6 March 1998 | |||||||
Cost | |||||||
£55 million | |||||||
Contractor | |||||||
Norwest Holst, Keir, SGE consortium | |||||||
Additional Information | |||||||
| |||||||
On road(s) | |||||||
A548 | |||||||
Crossings related to the A548 | |||||||
Flintshire Bridge is an asymetric cable-stayed bridge across the River Dee on the A548 near Flint, Flintshire. It was opened by H.M. Queen Elizabeth on 6 March 1998.
Total length is 954m and deck width 28m for the dual carriageway and paths. The 118m high A shaped tower supports the 294m main span (an in-situ cast concrete deck) by way of 38 pairs of stay cables. There are access viaducts on either side – 390m on the east and 270m on the west. On the main span the 194m longer span counterbalances the 100m end span.
The proposal and design, following a selection competition, was completed by Gifford Graham and Partners (part of Ramboll Group). Architect was Percy Thomas Partnership.
Links
- Deeside.com bridge birthday article
- Video about the bridge construction
- Romboll projects page
- Freyssinet page
Flintshire Bridge | |||||||
| |||||||
| |||||||
|