Downhill Lane Interchange
Jump to navigation
Jump to search
Downhill Lane Interchange | |||
Location Map ( geo) | |||
| |||
Location | |||
Town End Farm | |||
County | |||
Durham | |||
Highway Authority | |||
National Highways | |||
Junction Type | |||
Roundabout Interchange | |||
Roads Joined | |||
A19, A1290 | |||
Junctions related to the A1290 | |||
Downhill Lane Interchange is a junction on the A19 at the northwestern edge of the city of Sunderland. It provides access to the Nissan offices via the A1290, as well as north-western areas of Sunderland and a shortcut to East and West Boldon via Downhill Lane.
History
The junction opened as part of the Hylton Grange Interchange to Testos Roundabout section of the Sunderland Bypass on 20 March 1972. It initially had just south facing slip roads.
A scheme to convert both this junction from a diamond to a roundabout interchange, and the adjacent Testos Roundabout also to a grade-separated roundabout interchanges (with braided slip-roads) was constructed between 2019 and 2022, with Downhill Lane improvements opening to traffic in March 2022.
Routes
Route | To | Notes |
Tyne Tunnel | ||
Sunderland, Teesside | ||
Nissan Industrial Estate | ||
Boldon | ||
Hylton Castle | ||
Tyne Tunnel | now A19 | |
Sunderland, Teesside | now A19 |
Links
legislation.gov.uk
- The A19 Downhill Lane Junction Development Consent Order 2020 - This Order authorises Highways England to undertake works to alter the junction of the A19 Downhill Lane Junction, near West Boldon in South Tyneside and Washington in Sunderland and carry out all associated works.
Downhill Lane Interchange | ||||
| ||||
|